SciELO - Scientific Electronic Library Online

 
vol.21 issue1The discrete time, cost and quality trade-off problem in project scheduling: An efficient solution method based on CellDE algorithmPlanning empty container relocations under uncertainty author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Article

Indicators

Related links

  • On index processCited by Google
  • On index processSimilars in Google

Share


South African Journal of Industrial Engineering

On-line version ISSN 2224-7890
Print version ISSN 1012-277X

S. Afr. J. Ind. Eng. vol.21 n.1 Pretoria  2010

 

GENERAL ARTICLES

 

A model for quality management in a supply chain with a retailer and a manufacturer

 

 

A. Ahmadi JavidI; P. HoseinpourII

IDepartment of Industrial Engineering, Amirkabir University of Technology, Iran. ahmadiiayid@aut.ac.ir
IIDepartment of Industrial Engineering, Amirkabir University of Technology, Iran. p.hoseinpour@aut.ac.ir

 

 


ABSTRACT

This paper presents a model to study quality management in a supply chain system with one manufacturer and one retailer. The manufacturer invests in production quality, and the retailer compensates to improve service quality. The model is analysed using game theory.


OPSOMMING

'n Toevoerketting waar gehaltebestuur aangewend word deur 'n enkele vervaardiger en 'n enkele verbruiker word gemodelleer via die spelteorie. Die vervaardiger en die verbruiker neem deel aan besluitneming oor optimum befondsing van die bestuursaksies.


 

 

“Full text available only in PDF format”

 

 

REFERENCE

[1] Bachlausa, M., Tiwarib, M.K. & Chan, F.T.S. 2009. Multi-objective resource assignment problem in a product-driven supply chain using a Taguchi-based DNA algorithm, International Journal of Production Research, 47(9), pp 2345-2371.         [ Links ]

[2] Baiman, S., Fischer, P.E. & Rajan, M.V. 2000. Information, contracting, and quality costs, Management Science, 46(6), pp 776-789.         [ Links ]

[3] Baiman, S., Fischer, P.E. & Rajan, M.V. 2001. Performance measurement and design in supply chains, Management Science, 47(1), pp 173-188.         [ Links ]

[4] Baiman, S., Netessine, S. & Kunreuther, H. 2003. Procurement in supply chains when the end-product exhibits the weakest link property, Working paper, the Wharton School, University of Pennsylvania.         [ Links ]

[5] Balachandran, K.R. & Radhakrishnan, S. 2005. Quality implications of warranties in supply chain, Management Science, 51(8), pp 1266-1277.         [ Links ]

[6] Barber, B.M. & Darrough, M.N. 1996. Product reliability and firm value: The experience of American and Japanese automakers, Journal of Political Economy, 104(5), pp 1084-1099.         [ Links ]

[7] Chambers, C., Kouvelis, P. & Semple, J. 2006. Quality-based competition, profitability, and variable costs, Management Science, 52(12), pp 1884-1895.         [ Links ]

[8] Cheung, K.L. & Leung, K.F. 2000. Coordinating replenishments in a supply chain with quality control considerations, Production Planning & Control, 11(7), pp 697-705.         [ Links ]

[9] Choudhary, V., Ghose, A., Mukhopadhyay, T. & Rajan, U. 2005. Personalized pricing and quality differentiation, Management Science, 51(7), pp 1120-1130.         [ Links ]

[10] Degryse, H. 1996. On the interaction between vertical and horizontal product differentiation: An application to banking, The Journal of Industrial Economics, 44(2), pp 169-186.         [ Links ]

[11] Doraszelskiw, U. & Draganskaz, M. 2006. Market segmentation strategies of multiproduct firms, The Journal of Industrial Economics, LIV(1), pp 125-149.         [ Links ]

[12] Economides, N. 1989. Quality variations and maximal variety differentiation, Regional Science and Urban Economics, 19, pp 21-29.         [ Links ]

[13] El Maraghy, H.A. & Majety, R. 2008. Integrated supply chain design using multi- criteria optimization, International Journal of Advance Manufacturing Technology, 37, pp 371-399.         [ Links ]

[14] El Saadany, A.M.A. & Jaber, M.Y. 2008. Coordinating a two-level supply chain with production interruptions to restore process quality, Computers & industrial Engineering, 54, pp 95-109.         [ Links ]

[15] Gans, N. 2002. Customer loyalty and supplier quality competition, Management Science, 48(2), pp 207-221.         [ Links ]

[16] Ghodsypour, S.H. & O'Brien,C.. 2001. The total cost of logistics in supplier selection, under conditions of multiple sourcing, multiple criteria and capacity constraint, International Journal of Production Economics, 73, pp 15-27.         [ Links ]

[17] Hall, J.M. & Porteus, E.L. 2000. Customer service competition in capacitated systems, Manufacturing & Service Operations Management, 2, pp 144-165.         [ Links ]

[18] Hosanagar, K., Krishnan, R. & Choudhary, V. 2005. Pricing and resource allocation in caching services with multiple levels of quality of service, Management Science, 51(12), pp 1844-1859.         [ Links ]

[19] Hsu, V.N., Xu, S.H. & Jukic, B. 2008. Optimal scheduling and incentive compatible pricing for a service system with quality of service guarantees, Manufacturing & Service Operations Management, 11(3), pp 375-396.         [ Links ]

[20] Jarrell, G. & Peltzman, S. 1985. The impact of recalls on the wealth of sellers, Journal of Political Economy 43(3), pp 467-473.         [ Links ]

[21] Juran, J.M., Gryna, F.M.J. & Bingham, R.S. 1974. Quality control handbook (3rd ed.), McGraw-Hill Book Co, New York, NY.         [ Links ]

[22] Kim, K. & Lin, D. 2006. Optimization of multiple responses considering both location and dispersion effects, European Journal of Operational Research, 169, pp 133-145.         [ Links ]

[23] Lee, M.S., Lee, Y.H. & Jeong, C.S. 2003. A high-quality-supplier selection model for supply chain management and ISO 9001 system, Production Planning & Control, 14(3), pp 225-232.         [ Links ]

[24] Lim, W.S. 2001. Producer-supplier contracts with incomplete information, Management Science, 47(5), pp 709-715.         [ Links ]

[25] Mann, D.P. & Wissink, J.P. 1990. Money-back warranties vs. replacement warranties: A simple comparison, American Economic Review, 80(2), pp 432-436.         [ Links ]

[26] Melumad, N.D. & Ziv, A. 2004. Reduced quality and an unlevel playing field could make consumers happier, Management Science, 50(12), pp 1646-1659.         [ Links ]

[27] Mukhopadhyay, S.K. & Setaputra, R. 2007. A dynamic model for optimal design quality and return policies, European Journal of Operational Research, 180, pp 1144-1154.         [ Links ]

[28] Piga, C. & Poyago-Theotoky, J. 2005. Endogenous R&D spillovers and locational choice, Regional Science and Urban Economics, 35, pp 127- 139.         [ Links ]

[29] Porteus, E.L. 1990. The impact of inspection delay on process and inspection lot sizing, Management Science, 36, pp 999-1007.         [ Links ]

[30] Ramudhin, A., Alzaman, C. & Bulgak, A.A. 2008. Incorporating the cost of quality in supply chain design, Journal of Quality in Maintenance Engineering, 14(1), pp 71-86.         [ Links ]

[31] Ren, Z.J., Zhou & Y.P. 2008. Call center outsourcing: Coordinating staffing level and service quality, Management Science, 54(2), pp 369-383.         [ Links ]

[32] Reyniers, D.J. & Tapiero, C. 1995a. The delivery and control of quality in supplier-producer contracts, Management Science, 41(10), pp 1581-1589.         [ Links ]

[33] Reyniers, D.J. & Tapiero, C. 1995b. Contract design and the control of quality in a conflictual environment, European Journal of Operational Research, 82(2), pp 373-382.         [ Links ]

[34] Rupp, N.G. 2004. The attributes of a costly recall: Evidence from the automotive industry, Rev. Ind.Org, 25(5), pp 21-44.         [ Links ]

[35] Sanjo, Y. 2007. Hotelling's location model with quality choice in mixed duopoly, Economics Bulletin, 18(2), pp 1-11.         [ Links ]

[36] Starbird, S.A. 1997. Acceptance sampling, imperfect production and the optimality of zero defects, Naval Research Logistics Quarterly, 44, pp 515-530.         [ Links ]

[37] Tagaras, G. & Lee, H.L. 1996. Economic models for vendor evaluation with quality cost analysis, Management Science, 42, pp 1531-1543.         [ Links ]

[38] Tapiero, C.S. 2007. Consumers risk and quality control in a collaborative supply chain, European Journal of Operational Research, 182, pp 683-694.         [ Links ]

[39] Tellis, G.J. & Johnson, J. 2007. The value of quality, Marketing Science, 26(6), pp 758-773.         [ Links ]

[40] Tunca, T.I. & Zenios, S.A. 2006. Supply auctions and relational contracts for procurement, Manufacturing & Service Operations Management, 8(1), pp 43-67.         [ Links ]

[41] Wang, W. & Wang, J. 2003. Research on approach of supply chain planning with quality control in an OW environment, Proceeding of the 42nd IEEE Conference on Decision and Control.         [ Links ]

[42] Xu, X. 2009. Optimal price and product quality decisions in a distribution channel. Management Science, 55(8), pp 1347-1352        [ Links ]

[43] Yang, J.S. & Pan, J.C. 2004. Just-in-time purchasing: An integrated inventory model involving deterministic variable lead time and quality improvement investment, International Journal of Production Research, 42(5), pp 853-863.         [ Links ]

[44] Zhu, K., Zang, R.Q. & Tsung, F. 2007. Pushing quality along the supply chain, Management Science, 53(3), pp 421-436.         [ Links ]

 

 

* Corresponding author

Creative Commons License All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License