SciELO - Scientific Electronic Library Online

 
vol.19 issue2 author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Article

Indicators

Related links

  • On index processCited by Google
  • On index processSimilars in Google

Share


South African Journal of Industrial Engineering

On-line version ISSN 2224-7890
Print version ISSN 1012-277X

S. Afr. J. Ind. Eng. vol.19 n.2 Pretoria  2008

 

Goal programming model for production planning in a toothpaste factory

 

 

A.D. AdeyeyeI; O.E. Charles-OwabaII

IDepartment of Industrial and Production Engineering, University of Ibadan, Ibadan, Nigeria ademola.adeyeye@mail.ui.edu.ng
IIDepartment of Industrial and Production Engineering, University of Ibadan, Ibadan, Nigeria oeowaba@yahoo.com

 

 


ABSTRACT

The GP model was developed for production planning in a toothpaste factory. Two objectives were distinguished: minimization of processing cost, and maximization of the capacity utilization of production facilities. Two priority structures were used to explore the trade-off options. When processing cost minimization was assigned the first priority, the utilizations of Processing Plant 1 and Filling Machine 2 were 20.32% and 0.18% respectively. When capacity utilization was assigned first priority, the processing cost increased by 7.55% but capacity utilization improved. The least utilized facility was Filling Machine 1 with a utilization of 43.85%.


OPSOMMING

Die GP-model is ontwikkel vir die beplanning van produksie van 'n tandepastafabriek. Twee doelwitte is gestel w die beplanning naamlik minimisering van produksiekoste, en maksimering van prosesbesetting. Wanneer minimisering van koste gebruik word as eerste prioriteit is die besettingswaardes van prosesseringaanleg 1 20.32% en van vulmasjien 2 0.18%. Wanneer prosesbesetting gebruik word as eerste prioriteit neem die proseskoste toe met 7.55% en styg die prosesbesetting. Vulmasjien 1 se gevolglike besetting was 43.85%.


 

 

“Full text available only in PDF format”

 

 

REFERENCES

[1] Sundraham, R.M. 1988. An application of Goal Programming Technique in metal cutting, International Journal of Production Research, 16(5), pp 375-382        [ Links ]

[2] Zanakis, S.H. and Smirth, J.S.1980. Chemical production via Goal Programming, International Journal of Production Research,18(16), pp 687-697        [ Links ]

[3] Zaloom, V., Tolgga, A. and Chu, H. 1986. Bank funds management by Goal Programming, Computer and Industrial Engineering, 11(1-4), pp 132-135        [ Links ]

[4] Chames, A. and Cooper, W.W. 1962 Management models and industrial applications of linear programming, Vol. 1. New York: Wiley        [ Links ]

[5] Giannikos, loannis. 1994. A preemptive Goal Programming model for locating obnoxious facilities, Studies in Regional and Urban Planning, 3(1), pp 141- 152        [ Links ]

[6] Lawrence, K.D. and Burbridge. 1976. A multiple goal linear programming model for coordinated production and logistics planning, International Journal of Production Research, 14(2), pp 215-222        [ Links ]

[7] Biswas, Animesh and Bijay Baran Pal. 2005. Application of fuzzy goal programming technique to land use planning in an agricultural system. Omega 33(5), pp 391-398        [ Links ]

[8] Esfandiari, Bijan, Aryanezhad, Mir Bahador, and Abrishamifar, S. Amir. 2004. Open pit optimization including mineral dressing criteria using 0-1 non-linear goal programming: Mining technology, IMM Transactions, Section A, 133(1), pp 3-16        [ Links ]

[9] Gokcen, Hadi and Agpak, Kursad. 2006. A Goal Programming approach to simple u-line balancing problem. European Journal of Operational Research. 171(2), pp 577-585        [ Links ]

[10] Baykasoghlu, Adi I. and Tolunay, Gochen. 2006. A Tabu search approach to fuzzy goal programs and an application to aggregate production planning, Engineering Optimization 38(2), pp 155-177        [ Links ]

[11] Hillier, F. S. and Lieberman, G.J. 1990. Introduction to operation research. McGraw-Hill, pp 267-291        [ Links ]

Creative Commons License All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License