South African Journal of Industrial Engineering

versión On-line ISSN 2224-7890
versión impresa ISSN 1012-277X

S. Afr. J. Ind. Eng. vol.19 no.2 Pretoria  2008

 

Decision-making and management of pre-investment in a programme of projects

 

 

R.P. BothaI; H. SteynII

IGraduate School of Technology Management, University of Pretoria, South Africa rbotha@hatch.co.za
IIGraduate School of Technology Management, University of Pretoria, South Africa herman.steyn@up.ac.za

 

 


ABSTRACT

Owing to ever-increasing business pressures and the resulting requirements of organisations, individual projects rarely fulfil all expectations; so it is quite often necessary to implement a programme of interdependent projects. In such programmes the matter of pre-investment (investing effort or money before the project results are required) is a recurring theme amongst programme managers. However, very few decision-making techniques or management guidelines on the topic of pre-investment are available. In this paper a framework is proposed to assist a programme or project manager in the decision-making and management of pre-investment in a programme. The framework is based on pre-investment propositions with high levels of support from a Delphi panel, in the context of a multi-billion Rand petrochemical programme. The results of the research are three matrices that provide guidance on the timing of pre-investment, tools and information required, and benefits of pre-investment. These guidelines all relate to four aspects of pre-investment: context, systems and procedures, timing, and scope. Even though the work was done in the context of a specific case, the pre-investment guidelines should be applicable in various industries.


OPSOMMING

Die steeds toenemende druk op besighede en die gevolglike vereistes wat ondernemings aan hulself stel, lei daartoe dat individuele projekte selde aan al die verwagtings voldoen. Dit is dus dikwels nodig om 'n program van interafhanklike projekte te implementeer. In sulke programme is voorafinvestering (investering van fondse of werk voordat projekresultate vereis word) 'n saak wat by herhaling deur programbestuurders opgehaal word. Daar bestaan egter tans geen besluitnemings-tegnieke of riglyne vir die bestuur van voorafinvestering nie. Hierdie artikel behandel 'n raamwerk om programbestuurders en projekbestuurders behulpsaam te wees met besluitneming oor en die bestuur van vooraf-investering. Die raamwerk is gebaseer op proposisies ten opsigte van vooraf-investering met 'n hoë vlak van aanvaarding van 'n Delphipaneel, in die konteks van 'n multi-biljoen Rand petrochemiese program. Die navorsing het drie matrikse opgelewer wat riglyne verskaf vir die tydsberekening vir vooraf-investering, hulpmiddels en inligting wat vereis word, en die voordele van vooraf-investering. Al hierdie riglyne hou verband met vier aspekte van vooraf-investering: konteks, stelsels en prosedures, tydsberekening, en bestek. Alhoewel die werk gedoen is in die konteks van 'n spesifieke geval, behoort die riglyne toepassing te vind in verskeie bedrywe.


 

 

“Full text available only in PDF format” 

 

 

REFERENCES

[1] Adams, E.W., Fagot, R.F. & Robinson, R.E. 1965. A theory of appropriate statistics, Psychometrika, 30: 99-127.         [ Links ]

[2] Delbecq, A.L., Van de Ven, A.H., Gustafson, D.H. 1975. Group techniques for program planning: A guide to nominal group and Delphi processes. Glenview, Illinois: Scott, Foresman.         [ Links ]

[3] Dietrich, P. & Lehtonen, P. 2005. Successful management of strategic intentions through multiple projects - Reflections from empirical study, International Journal of Project Management, 23: 386-391.         [ Links ]

[4] Ferns, D.C. 1991. Developments in programme management, International Journal of Project Management, 9: 148-156.         [ Links ]

[5] Ghasemzadeh, F. & Archer N.P. 2000. Project portfolio selection through decision support, Decision Support Systems, 29: 73-88.         [ Links ]

[6] Hamilton, A. 2002. Considering value during early project development: A product case study, International Journal of Project Management, 20: 131-136.         [ Links ]

[7] Joaquin, D.C. & Khanna, N. 2001. Investment timing decisions under threat of potential competition: Why firm size matters, The Quarterly Review of Economics and Finance, 41: 1-17.         [ Links ]

[8] Maylor, H., Brady, T., Cooke-Davies, T. & Hodgson, D. 2006. From projectification to programmification, International Journal of Project Management, 24: 663-674.         [ Links ]

[9] Pellegrinelli, S. 2002. Shaping context: The role and challenge for programmes, International Journal of Project Management, 20: 229-233.         [ Links ]

[10] Pellegrinelli, S. 1997. Programme management: Organising project based change. International Journal of Project Management, 15(3).         [ Links ]

[11] Project Management Institute. 2003. A Guide to the Project Management Body of Knowledge, 3rd edition. Newton Square, Pennsylvania: PMI.         [ Links ]

[12] Project Management Institute. 2006. Standard for Program Management, 1st edition. Newton Square, Pennsylvania: PMI.         [ Links ]

[13] Shen, Q. & Chung, J.K.H. 2002. A group decision support system for value management studies in the construction industry, International Journal of Project Management, 20: 247-252.         [ Links ]

[14] Waddell D. 2005. Program management: The next step in the evolution of project management?, Problems and Perspectives in Management, 3: 160-168.         [ Links ]

[15] Wambach, A. 2000. Payback criterion, hurdle rates and the gain of waiting, International Review of Financial Analysis, 9: 247-258.         [ Links ]

[16] Yin, K.R. 2004. Case study research: Design and methods. 2nd edition. Sage Publications: New Delhi. http://en.wikipedia.org/wiki/Likert_scale, accessed on 10 August 2007.         [ Links ]

 

 

1 The author was enrolled for an M Eng (Project Management) in the Department of Engineering and Technology Management, University of Pretoria.

Creative Commons License Todo el contenido de esta revista, excepto dónde está identificado, está bajo una Licencia Creative Commons