Transferring IT project management experiential knowledge into organisational learning

 

 

Korong MothapoI; Nazeer JosephII, *

IDepartment of Applied Information Systems, University of Johannesburg, South Africa. Email: korongeva@yahoo.com
IIDepartment of Applied Information Systems, University of Johannesburg, South Africa. Email; nioseph@uj.ac.za; ORCID: https://orcid.org/0000-0002-9945-2036;

 

 


ABSTRACT

PURPOSE OF THE STUDY: A fundamental complexity within IT projects is how knowledge management and organisational learning exploit project management experiential knowledge from previous IT projects to improve these project initiatives' benefits. This study investigated the banking sector's challenges in sharing and managing project management experiential knowledge within IT projects. The goal of the research was to determine how IT project management experiential knowledge is integrated into organisational learning
DESIGN/METHODOLOGY/APPROACH: An interpretivist lens via an exploratory case study was adopted. The case study was based on a single case focusing on a multinational financial institution's IT project management office. A total of 12 IT project managers were willing to participate
FINDINGS: This study's key findings reveal a lack of a central and standard model used by IT project managers to capture, store and share project management experiential knowledge within the organisation, especially in IT projects. From an organisational learning perspective, most participants could not define organisational learning, and others defined it differently. Regarding project learning and knowledge management in IT projects, the participants understood project lessons and project learning as being done through post-project sessions. Finally, project learning practices were understood by participants to be post-project review meetings, templates and collaborative technology to collect, store and retrieve the project lessons
RECOMMENDATIONS/VALUE: This research promotes a "how" focus built on the emergent insights from the six themes. The guidelines ensure that previous IT project management experiential knowledge is seamlessly integrated into new IT projects through organisational learning
MANAGERIAL IMPLICATIONS: A life cycle model for translating IT project management experiential knowledge into organisational learning was developed to assist IT project managers. The model allows organisations to ensure that the three key factors, i.e. knowledge management, project learning and organisational learning, are managed effectively
JEL CLASSIFICATION: M15

Keywords: Business management; IT management; IT project; Lessons learned; Lessons learnt; Operational management; Project knowledge management; Project learning; Project management experiential knowledge; Risk management


 

 

1. INTRODUCTION

The benefits of capturing project management experiential knowledge and integrating it into organisational learning are clear, but project complexities challenge the integration of experience-based knowledge acquisition (Fai Pun & Nathai-Balkissoon, 2011; De Toni & Pessot, 2021). A critical problem is that knowledge sharing within and between projects is inefficient and ineffective, resulting in repeated mistakes and a lack of growth in project management effectiveness (Rowe & Sikes, 2006; Favoretto & Carvalho, 2021).

Nonaka and Takeuchi (1995) and Malik et al. (2020) have discussed the importance of managing knowledge for a competitive advantage. The sharing and application of knowledge are key sources of sustained competitive advantage. Cerezo-Narváez et al. (2021) argue that sustained competitive advantage can be achieved through robust knowledge management practices. These practices ensure that project lessons are learnt and shared through appropriate mechanisms. Furthermore, Kotnour (2000) and Okudan et al. (2021) pinpoint the value of capturing project management experiential knowledge to mitigate project risks by identifying actions to avoid, solutions to implement and knowledge-sharing mechanisms. Taking a knowledge-based perspective in any project undertaken by the organisation will enable project success and overall organisational growth (Wu & Passerini, 2013).

Fai Pun and Nathai-Balkissoon (2011) believe that organisations are most likely to become and remain market leaders if they integrate knowledge management into organisational learning effectively. They mention how this helps organisations identify, create, store and share important information. Furthermore, knowledge management is a systematic process for acquiring, organising and communicating knowledge among organisational stakeholders to facilitate efficiency and productivity (Ajmal et al., 2010). Organisational learning can occur at individual, group and organisational levels. Firestone and McElroy (2004) assert that the relationship between organisational learning and knowledge management is close enough to be intimate. One cannot exist without the other (Fai Pun & Nathai-Balkinssoon, 2011). They should join forces to develop a unified discipline because this can expand the body of research work (Firestone & McElroy, 2004). Firestone and McElroy (2004) assert that the relationship between organisational learning and knowledge management is close enough to be intimate and suggest that organisational learning and knowledge management join forces to develop a unified discipline because this can expand the body of research work. The problems with organisational innovation, integrity, accountability and risk management could be alleviated if the common concerns are embraced, and different parts of the organisation work together towards solutions based on learning and organisational knowledge growth (De Castro et al., 2022).

Haak-Saheem and Tamer (2014) indicate that the only way to create sustainable economic and social development is to promote learning in all aspects. The knowledge management approach can be developed to focus on creativity and organisational learning (De Castro et al., 2022). Haak-Saheem and Tamer (2014) have proved that a knowledge-oriented economy is not so much about the number of educated people as it is a mindset that focuses on making the right decisions in winning opportunities and visions and creating a vibrant culture that fosters creativity and innovation. Duffield and Whitty (2015) distinguish between social and cultural factors, as experiential knowledge is disseminated through the knowledge management process and social-based methods. Knowledge sharing is arguably most effective when individuals communicate through various networking and mentoring processes.

A fundamental complexity within IT projects is how knowledge management and organisational learning facilitate learning from previous IT projects to enable improved benefits from these project initiatives (De Toni & Pessot, 2021). Authors such as Pessot (2017), Marnewick and Joseph (2020) and Joseph and Marnewick (2021) argue how information, communication and organisational learning are complex components within projects. The reality is that while IT projects serve as significant strategic initiatives, knowledge management is not sufficiently embedded in project management processes (Foote & Halawi, 2018). Pettiway and Lyytinen (2018) identify several learning methods in the project management environment, and experiential learning is reflected as a pivotal learning method. Moreover, IT projects are potent vehicles for facilitating organisational learning when effective knowledge transfer protocols are in place (Pettiway & Lyytinen, 2018; Hussien et al., 2021; De Castro et al., 2022). Current research either stipulates the "what" aspects of transferring knowledge in and between general projects or does not contextualise "how" experiential knowledge is transferred in and between IT projects. The gap this research aimed to address was how project management experiential knowledge is transferring into organisational learning. It was imperative to explore the application of project management experiential knowledge from the knowledge and organisational learning perspective as it is a critical and value-adding aspect of the project management life cycle (Williams, 2008). Project management experiential knowledge adds more value when it is documented, communicated, archived and adaptable.

This study investigated challenges in the banking sector in sharing and managing project management experiential knowledge within IT projects. A model is presented that organisations can use to create a culture of continuous learning through IT projects implemented in the organisation. There is evidence of low IT project success, even though organisations recognise that they need to understand project management in order to be successful (Standish Group, 2018). A positive relationship has been found between project performance and project learning; a better understanding of how to share and manage knowledge in IT projects effectively should increase the chances of project success (Anantatmula, 2006; Fauzi et al., 2021).

The goal of the research was to determine how IT project management experiential knowledge is integrated into organisational learning. The research objectives were to understand: (i) organisational learning regarding IT projects, (ii) project learning and knowledge management in IT projects and (iii) IT project learning practices.

The article consists of five sections. Section 2 is an outline of the literature reviewed, covering critical concepts involved in this study. The research methodology used in the study is discussed by detailing how data was collected, prepared and analysed in Section 3. Section 4 presents the results and discussion, and section 5 contains practical recommendations. Section 6 includes a summary of the study outcomes, with implications and study limitations.

 

2. LITERATURE REVIEW

Knowledge transferred in and between projects can be referred to as expert, methodological, procedural and experiential knowledge, contributing to the organisational knowledge base (De Castro et al., 2022). Therefore, taking a knowledge-based perspective in any organisational project should enable project success and overall organisation growth. The lack of organisation, socialisation, integration and knowledge transfer negatively impacts project performance (Wu & Passerini, 2013). Knowledge management in project situations merges knowledge management and project management principles. Knowledge within projects, knowledge between different projects and knowledge about projects form part of project learning and knowledge management. The transfer of project experiential knowledge facilitates project success and organisational learning growth (Pettiway & Lyytinen, 2018; Fauzi et al., 2021; Hussien et al., 2021). Literature reflects organisational learning, project knowledge management and project learning as pivotal themes underpinning project management experiential knowledge transference (Firestone & McElroy, 2004; Wu & Passerini, 2013; Pettiway & Lyytinen, 2018; Fauzi et al., 2021; Hussien et al., 2021; Joseph & Marnewick, 2021; De Castro et al., 2022).

2.1 Project learning and IT projects

IT projects are knowledge-intensive, making it necessary for organisations to respond quickly and adapt to new changes. Williams (2008) notes how project management experiential knowledge is the most critical and value-adding aspect of the project management life cycle, but has been reported as the most ignored aspect during and at the project's end (Duffield & Whitty, 2015).

The Project Management Institute (2017) describes a project as a temporary and unique undertaking at all levels in the organisation and involving all individuals. Shenhar (2001) notes how a project is a collection of tasks that involve a group of individuals tasked to deliver services or products within a set time frame. Projects are the template for organisations to operationally and strategically redesign how they respond and adapt to the environmental changes. Strategic project implementation ensures that the highest returns are achieved by expanding human knowledge creation and effective organisational design that supports project management (Cicmil, 1997).

For Argyris and Schon (1978) and Huber (1991), project learning involves creating, sharing and applying knowledge. Scarbrough et al. (2004) believe that applying that knowledge depends on the more expansive organisational learning. From a project perspective, organisational learning is a multi-level concept as it involves learning among individuals, teams and the organisation as a whole (Wiewiora et al., 2020). This learning process is facilitated via feedback and feedforward loops to ensure a continuous flow of knowledge sharing. Yang et al. (2020) contend that a major hindrance is the retrieval of information that fosters knowledge development and organisational learning. Ayas (1996) maintains that project learning requires a deliberate effort designed and integrated within organisational project practice. Project lessons must be significant because they have a material impact on operations and are applicable to identify specific design processes that reduce potential failures and enforce positive results (Tukel et al., 2008; Rubin, 2013).

Numerous practices highlight the importance of incorporating and capturing project management experiential knowledge into organisational procedures and project management methodologies. Project lessons can be captured through the use of IT infrastructure and systems. Weber and Aha (2003) identify informal and formal connect systems, and informal and formal collect systems which organisations can use to collect data. Formal group meetings are also used to facilitate project management experiential knowledge (Williams, 2008). Sessions such as brainstorming, post-project reviews and storytelling are standard practices to collect project management experiential knowledge. Communities of practice are another avenue where the interactions of groups share a common goal or problem. Wenger-Trayner and Wenger-Trayner (2015) suggest implementing communities of practice across organisational business units to foster knowledge sharing. This is in line with Lee et al. (2014), who state that knowledge management systems and communities of practice can be used to foster organisational learning, as organisations often lose valuable knowledge due to employees leaving the organisation. Collecting project management experiential knowledge at the end of each project phase and storing all this knowledge in a central database creates a project knowledge management culture (Wierzchon, 2005). This culture encourages people to use the stored project management experiential knowledge, continuously review the stored lessons and ensure that improvements are made. This allows technology-mediated informal learning where project lessons are reflected on to develop new and improved work techniques (Za et al., 2014).

In essence, projects are about change, and an organisation may require new skills, changes in the organisational structure and revised stakeholder accountability after project implementation (Jin Xiu, 2019). Organisational culture, knowledge process and technology are identified as critical inhibitors relating to knowledge management effectiveness and its influence on IT projects (Jin Xiu, 2019).

2.2 Critical inhibitors to project management experiential knowledge in IT projects

Most organisations still rely on the command-and-control culture - a military model (Project Management Institute, 2017). Williams (2008) believes that organisational culture is a significant barrier to organisational learning. Suppiah and Singh Sandhu (2011) maintain that organisational culture is ignored as an essential factor due to organisational values being taken for granted, as assumptions are made without facts or communication of expectations. According to Rubin (2013), the lack of leadership commitment to the learning process is one of the most giant stumbling blocks to developing project management experiential knowledge. Organisations that consider culture can plan strategically and decide on the types of knowledge management initiatives to carry out (Ajmal et al., 2010; Foote & Halawi, 2018). Standish Group (2018) found that one of the key reasons IT projects fail is poor understanding and organisational culture management. This implies that the culture and structure of an organisation influence the way projects are managed and executed.

Martín Cruz et al. (2009) point out that knowledge transfer increases work efficiency among employees, making it essential for efficient management. The extrinsic and intrinsic motivations are significant determinants for knowledge transfer. Effective knowledge transfer, improvisation in knowledge transfer and advising against knowledge replication are identified by Krylova et al. (2016) as the three ways of dealing with the question of knowledge transfer. For Zapata Cantú et al. (2009), direct contact is crucial for developing trust and understanding between organisational parties. Knowledge transfer and sharing are developed by cultivating and encouraging employees to participate in knowledge transfer and retrieval practices (Cerezo-Narváez et al., 2021). Knowledge transfer practices should underpin initial project estimates and planning.

Wu and Fang (2010) explain that knowledge transfer challenges emerge from various knowledge characteristics that require governance mechanisms to manage knowledge transfer. The governance mechanisms Wu and Fang refer to are made up of four constructs: the market-based mechanism (lower context and lower content ambiguity), trust-based mechanism (lower context and higher content ambiguity), reciprocity mechanism (higher context and higher content ambiguity) and norm-based mechanism (higher context and lower content ambiguity). Davenport and Prusak (2000) believe that the primary role of knowledge management systems is to accelerate the knowledge transfer speed. Knowledge management tools mainly address the problem of knowledge transfer and promote knowledge sharing.

However, according to McLaughlin et al. (2008), no single technological solution exists for knowledge management across the organisation as most organisations are still reliant on legacy systems. Wagner et al. (2002) believe that intranets' success depends on proper planning, implementation and use by the organisation. Raymond et al. (2020) investigated the importance of aligning IT capabilities with strategic capabilities and found that this fosters improved organisational learning and success in the long term. Conversely, Santoro et al. (2018) investigated the role of IT infrastructure, collaborative technologies and IT adoption and revealed that there is no direct relationship with innovative organisation projects such as IT projects. However, the relationship is mediated by implementing effective collaboration practices that explore internal and external knowledge to enhance innovative initiatives. Hari et al. (2005) mention that knowledge capture initiatives promote innovation, improve project methodologies, reduce costs and save time. The above implies that technology, directly and indirectly, enables and exploits knowledge management and organisational learning practices within IT projects.

2.3 The triad of organisational learning, knowledge management and project management experiential knowledge

Fosshage (2013) identifies the following as considerations for implementing project lessons within an organisation: (i) an honest critique of whether the success criteria of company culture, processes and management commitment are in place before proceeding, (ii) management support is an essential ingredient for any organisational process, (iii) lessons learning systems need not be stand-alone and could be incorporated into existing tools and (iv) the experiential knowledge acquisition process should act as a bridge between the people and the data. Project knowledge management links the principles of knowledge management and project management. Knowledge within projects, knowledge between the different projects and knowledge about projects form part of project management experiential knowledge (Hanisch et al., 2009). Due to the temporary nature of projects, project knowledge is shared throughout the organisation at the end of the project, and this can be referred to as knowledge fragmentation. Because of the time factor, lower priority is given to tasks which do not directly contribute to project deliverables. Furthermore, project managers identify and document and review project lessons during the project close-out meetings, but do not ensure that they are transferred into organisational learning (Trevino & Anantatmula, 2008).

According to Wu and Passerini (2013), knowledge management aims to create, organise, store, transfer and coordinate the adoption of acceptable business practices to improve organisational performance. Furthermore, Khoza (2019b) reveals that the most practical knowledge management process in software development projects is knowledge discovery, knowledge sharing and knowledge application. These are further supported and facilitated by the social constructs of positive attitude and the intention to share knowledge. Bassellier et al. (2003) suggest that organisations should create an overlap of knowledge and expertise between IT and businesspeople. This will improve the coordination of these interdependencies (Gemino et al., 2015). The application of project knowledge management and project management experiential knowledge remains limited within the organisational practice. It will also advance successful project implementation, IT-based innovation, sustainable competitive advantage and the ability to cope with business and technology changes. The business benefits of knowledge sharing are only achieved when knowledge is transferred between individuals in the organisation (Johansson et al., 2013). Therefore, IT project management experiential knowledge must be accessible and tied to both organisational and individual performance objectives. Figure 1 provides an overview of the triad of organisational learning, knowledge management and project management experiential knowledge.

 

3. METHODOLOGY

In the study an interpretivist approach was adopted. Blaikie (2009) defines interpretive ontology as the science or study that deals with reality and individuals' belief systems which reflect their interpretation of what constitutes facts. Although this approach has its limitations, such as result subjectivity, it provided more detailed and in-depth data on what was happening in the organisation surveyed. The exploratory case study approach was selected for this study mainly because the researcher was focused on the "how" aspect of the research phenomenon, i.e. how IT project management experiential knowledge is integrated into organisational learning.

Furthermore, it is essential to understand and evaluate the context of the research. The study followed the high-level case study process of Yin (2012), which is plan, design, collect data, analyse data and share the data through a report. The case study was based on a single case focusing on a multinational financial institution's IT project management office.

A total of 50 IT project managers were identified as valuable contributors to the objectives of the study. However, only 12 IT project managers were willing to participate and were interviewed for approximately 60 minutes using a semi-structured interview guide. The 12 participants were geographically dispersed across the globe, and telephonic interviews were deemed the most appropriate method for this study (Farooq & Villiers, 2017). Telephonic interviews have multiple cost and time benefits while facilitating anonymity and privacy and negating distractions (Block & Erskine, 2012; Drabble et al., 2016). Drabble et al. (2016) explain that compared to face-to-face interviews, telephonic interviews can yield quality results suitable for various research initiatives.

The interviewees were opposed to recording the interview sessions because of organisational constraints. In Chong's study (2008) interviewees also opposed the recording of the sessions and explicit notes were therefore taken to capture the insights regarding each interview question. Two principles were adopted to ensure explicit note taking (Zahle, 2021): adequate description and relevance. Adequate description ensures that the interview notes clearly articulate and approximate the words an interviewee would or did use. Relevance ensures that the interview notes accurately capture insights about the interview questions and overarching research question. Explicit notes were captured on the interview guide of each participant (Appendix A).

The interview guide was based on answering the research question to determine how IT project management experiential knowledge is implemented for organisational learning. Reliability in qualitative research is approached differently, as researchers cannot apply statistical tests as in quantitative research. The research methodology section thus provides detail and transparency regarding the research decisions and implementation (Coleman, 2021). Moreover, the findings were presented to subject matter experts and other project managers within the case study organisation to ensure that the preliminary themes and results were logically formulated (Coleman, 2021). Face and content validity were applied to enhance validity. For face validity, the researcher ensured that the interview questions were clear and understandable by clarifying with the participants whenever required. Probing questions were also used to ensure that the information captured was a true reflection of what the participants intended to say. For content validity, member checking was applied in that all participants were provided with the initial findings to verify their accuracy.

Interviews were conducted with 12 of the 50 targeted project managers, and a consent form was completed by each participant. The interview guide focused on project learning, organisational learning, project knowledge management and suggestions on how to integrate project management experiential knowledge in organisational learning. As noted previously, explicit notes were captured on the researcher's interview guide (Farooq & Villiers, 2017). The coding model of Qureshi and Ünlü (2020) was adapted: initial coding, focused coding and theoretical coding. Initial coding required the explicit notes from each interview (Appendix A) to be refined into concise memos under each interview question (Appendix B). Codes were inductively identified, written and classified. Initial categories were identified and defined during the latter stages of the initial coding phase. Focused coding involved refining and strengthening the codes and categories emerging from the data. The focused coding process was done using constant comparison, thus allowing the researchers to refine the codes and categories. Theoretical coding logically mapped the categories to identify emergent themes to address the research problem and goal.

 

4. FINDINGS AND DISCUSSION

The bond yield was relatively high at the beginning of the study period and peaked at 16.99 percent in May 1995. Since that period, the yield rate had declined to the lowest point of 6.09 percent in May 2013. The 12 interview participants were from Mexico, USA, Ireland, Canada, France, Singapore and India because of the organisation's global footprint. 33 percent had IT project experience of 6-10 years, 25 percent had 1-5 years and another 25 percent had 11-15 years, 8 percent had 16-20 years and another 8 percent 21-25 years. Interestingly, half of the participants used a customised project management methodology, followed by 25 percent using a waterfall and agile combination. These results indicate that the organisation had not defined a centralised methodology to be used. This could harm the organisation due to the inconsistency in methodologies employed, suggesting a lack of project management experiential knowledge practices. An overview of the participants is provided in Table 1.

As per Table 2, six themes emerged. A coding design was developed to identify the participants' ideas and statements (Appendix A; Appendix B). The coding process was repeated three times to ensure that nothing was overlooked. Final checks were done to see if codes relating to the same theme and matching codes were merged. A final transcription analysis grid was written and displayed in table format according to the themes (Table 2).

4.1 Organisational learning and knowledge management

Organisational learning and knowledge management was first explored in this study. The first interview question was: "How do you define organisational learning?'. Table 3 provides an overview of how organisation learning was defined and viewed from the participants' perspectives. Based on the organisation's global footprint, it was interesting to note how participants from the same regions had different definitions. The participants would have been expected to have had the same or similar definitions.

Interviewees 3 and 6 defined organisational learning as part of project management training. While De Toni and Pessot (2021) argue that training is an essential part of enabling organisational learning, there is no specific mention of project management training. Given the interviewees' background (Table 1), they viewed organisational learning from a project management perspective and believed that proper discipline training could enhance organisational learning in the long term.

Interviewees 2, 5 and 9 defined organisational learning as a set of semi-structured organisational procedures. This is in line with the view of Wang and Ahmed (2003), who highlight learning processes or systems as one of the five concepts forming the basis of organisational learning. Hasson et al. (2016) point out that organisational learning is enabled when internal and external organisational systems are interconnected.

Interviewees 7 and 11 defined organisational learning as knowledge sharing. Marsick and Watkins (1999) highlight that organisations need to ensure that proper knowledge structures and a knowledge sharing culture are in place for organisational learning to be effective. Hasson et al. (2016) regard the creation and sharing of knowledge as one of the four dimensions of how organisational learning occurs. Furthermore, Kotnour (2000) shows that mature organisations create, acquire, transfer and continuously improve to reflect on new knowledge.

Interviewees 4, 8, 10 and 12 defined organisational learning as a form of learning and implementing the learnings. Wang and Ahmed (2003) identify the learning process as part of the five organisational learning concepts and practices. Argyris and Schon (1978), Seely et al. (2000) and Bourne and Walker Derek (2004) indicate that for organisational learning to be effective, the organisation needs to learn and implement the learning for continuous improvement.

The overall findings of the first question revealed the organisational learning theme. Interviewees acknowledged the importance of project management training and how it facilitates organisational learning from a team and individual perspective. Furthermore, organisational learning is facilitated by well-defined and consistent semi-structured procedures within the organisation. Knowledge sharing among all organisational staff and entities is the realised benefit when correctly implementing training and procedure initiatives. Subsequently, learning is facilitated from current projects and implemented in future projects. Table 3 provides an overview of how organisation learning was defined and viewed from the participants' perspectives.

The second question was: "Do you have a process for organisational learning?'. As for the first question, different organisational processes were used by interviewees from the same region. Table 4 shows that interviewees 1, 3, 7, 9 and 12 used collaborative technology as an organisational learning process. Wu and Fang (2010) highlight that organisations need to adapt to rapid technological changes and adopt technologies conducive to enabling organisational learning. Abdul et al. (2014) note IT as an enabler for organisations to manage organisational learning.

Interviewees 4, 8, 10, 11 and 6 said that they implemented the organisational learning process through continuous procedure updates and process training. Bourne and Walker Derek (2004) mention in their definition of organisational learning that organisations need to create an environment supporting some trial and error to help individuals learn. Liao et al. (2008) refer to two methods by which organisational learning occurs, namely single-loop learning and double-loop learning. Both methods involve how organisations can improve their actions based on the strategy and policies governing the organisation.

Interviewees 2 and 5 mentioned the non-existence of an organisational learning process. The literature does mention how important it is for organisations to have processes in place; Hasson et al. (2016) highlight that strategic leaders need to provide and steer the organisation in the right direction regarding an organisational learning process. Marsick and Watkins (1999) emphasise that organisations need to ensure that they have proper knowledge structures and encourage sharing knowledge.

The organisational learning process theme emerged from question 2. Collaborative technology is considered a powerful tool to support the organisational learning process. Using customisable, collaborative technology such as SharePoint provides project teams and managers with a toolbox to document and share project management experiential knowledge. However, the collaborative technology cannot simply be selected and adopted as there should be training on the organisational learning processes and procedures governing technology usage. That said, a concern emerged from two interviews where no formal organisational learning process was defined. The organisational learning process cannot be an ad hoc endeavour and should be clearly articulated to facilitate organisational learning from project management experiential knowledge. Table 4 provides as overview of how participants perceived organisational learning processes.

The third question was: "How do you individually use and share knowledge within the organisation?". Table 5 lists the various knowledge sharing processes and practices within the organisation. Interviewees 1, 4, 10, 12, 8 and 9 used knowledge repositories to share knowledge within the organisation. Treser (2016) supports the use of knowledge repositories for sharing knowledge as this helps to ensure that knowledge is created correctly, stored and used. Abdul et al. (2014) add that using information systems helps organisations manage knowledge more effectively and efficiently.

Interviewees 7 and 11 acknowledged how sharing knowledge was a reactive endeavour as issues were analysed as they occurred. Santoro et al. (2018) emphasise how critical it is for organisations to create a proactive knowledge sharing culture, as a reactive approach is not effective in the long run. In many instances, knowledge is stored within individuals rather than using knowledge sharing systems to enable sharing. Khoza (2019a) argues the role of knowledge leakage where knowledge is lost due to staff turnover, among other factors. It is therefore imperative to ensure that appropriate knowledge sharing processes and practices are in place.

Interviewee 5 said that knowledge was shared during team meetings. Yang et al. (2020) identify culture as an influence on the behaviours that contribute to knowledge creation, sharing and application, which supports sharing knowledge in team meetings. Williams (2008) advocates the use of formal group meetings to facilitate project management experiential knowledge and knowledge sharing. Sessions such as brainstorming, post-project reviews and storytelling are powerful practices to enable knowledge sharing.

Interviewee 6 said they used collaborative tools to share knowledge. IT is highlighted as an enabler of knowledge sharing in the literature. Abdul et al. (2014) are of the opinion that most organisational leaders support the use of computers and communication technologies. Santoro et al. (2018) reveal how the use and implementation of IT infrastructure, collaborative technologies and IT adoption are mediated by implementing effective collaboration practices. Moreover, Raymond et al. (2020) assert the importance of aligning IT capabilities with strategic capabilities to foster long-term knowledge sharing and organisational learning.

It was discouraging that interviewees 2 and 3 did not have any formal process within the organisation regarding how knowledge was to be shared. Santoro et al. (2018) mention that organisational culture could hinder building knowledge creation and management in an organisation. Khoza (2019b) highlights the importance of knowledge management processes in software development projects and reaffirms that it is difficult for organisations to have structured knowledge management practices without processes.

The third question revealed the knowledge sharing process and practices theme. Most interviewees maintained that a knowledge repository ensures good knowledge management governance through a portal that provides templates to store and share project management experiential knowledge. Repository usage was supported in team meetings and collaborative methods. However, it was concerning that some interviewees noted no formal knowledge sharing process and practices, as reactive sharing was preferred. Insights from questions 1, 2 and 3 are explicit on the need for clear and consistent structures; otherwise, project management experiential knowledge sharing processes and practices cannot exist. An overview of knowledge sharing processes and practices is presented in Table 5.

4.2 Project learning and organisational learning

Project learning and its relation to organisational learning was explored next. The first question was: "What is your understanding of project knowledge and learning from your perspective?'. Table 6 provides an overview of how the participants perceived project learning.

Most of the participants arguably had a good understanding of what project learning entails and defined it as identifying project success and failure, including making recommendations on how to improve future performance or delivery of projects. Interviewees 2 to 10 described project learning as part of project management experiential knowledge practices. Ayas (1996) and Scarbrough et al. (2004) define project learning as creating, sharing and applying project management experiential knowledge throughout the broader organisation. Tukel et al. (2008) highlight that in a project-driven organisation, learning only comes from the improved project efficiency obtained from repetitive tasks. Practices such as project review meetings, communities of practice and technology-mediated informal learning are commonly used for project learning.

However, interviewees 1, 11 and 12 were not able to define their understanding of project learning. Williams (2008) mentions that although project management experiential knowledge is seen the most critical and value-adding aspect of the project management life cycle, it is reported to be the most ignored step of the life cycle.

Project learning was the fourth theme emerging from the data. Project management experiential knowledge practices are significant in this theme as interviewees argued for best practices to be in place to support long-term organisational learning. The organisational learning and knowledge management processes and procedures should not be ad hoc and should feed directly into project management learning endeavours. Correctly aligning organisational learning and knowledge management practices would address instances where no formal project learning practices are defined. Participants' interpretation of project learning it presented in Table 6.

The second question was: "What process do you use in your team to leverage knowledge in projects?'. An overview of project learning processes and participant responses is given in table 7. Interviewees 1, 2, 4, 6, 9, 11 and 12 confirmed that they conducted post-project review sessions as a project learning process to capture project lessons. Weber and Aha (2003) identify four systems used by organisations to collect project lessons: informal connect and collect systems as well as formal connect and collect systems. The formal connect and collect systems are more structured as teams share and collect project lessons. Williams (2008) mentions the use of different formal meetings such as group meetings, brainstorming sessions, post-project review groups and storytelling to collect project lessons. Lee et al. (2014) support communities of practice where groups of people gather to share concerns or problems to find a solution on an ongoing basis. Technology-mediated informal learning practice suggested by Za et al. (2014) involves daily project task reflections, knowledge sharing and innovative behaviour by project teams. These ensure that progress is reviewed and project knowledge is shared for each project.

The insights above articulate the project learning process theme and link closely with important insights within organisational learning and processes. Processes specific to project management should include post-project reviews, as these openly discuss project management experiential knowledge. While post-project reviews should be common knowledge, the format, structure and timing must be relevant to exploit the insights from participants. A flaw identified was that there are not always processes or repositories at project level to capture project management experiential knowledge. The organisational learning and knowledge management repository should not exist in isolation and should be fully integrated at project level. Table 7 reveals the how the project learning process is articulated by the participants.

The third question was: "Describe how you integrate project management experiential knowledge in your current projects.". The various approaches to integrating project management experiential knowledge into organisational learning are shown in table 8. Interestingly, there was a broad spectrum of approaches acknowledged by participants. Interviewees 1, 11 and 12 all noted the use of SharePoint as an integration tool to store and retrieve project management experiential knowledge from each other to create organisational learning. Lee et al. (2014) advocate the use of knowledge management systems to foster organisational learning. Furthermore, Raymond et al. (2020) acknowledge IT capabilities' role in fostering improved organisational learning and success in the long term.

Interviewees 2 and 6 predominantly used document templates to capture project management experiential knowledge and maintained a record of documents as part of organisational learning. This is arguably an inefficient approach to enabling organisational learning (Favoretto & Carvalho, 2021). We now live in a technologically dominant age where digital platforms serve as long-term solutions to enable organisational learning (Santoro et al., 2018).

Interviewees 3, 4, 9 and 10 maintain the use of review meetings for sharing project management experiential knowledge. While sharing lessons is effective among the various stakeholders, this knowledge remains tacit and should be combined with explicit knowledge to transfer into organisational learning (Cerezo-Narváez et al., 2021). Conversely, Santoro et al. (2018) reveal that platforms such as meetings could mediate organisational learning, as implementing effective collaboration practices can combine internal and external knowledge to enhance innovative initiatives.

Finally, interviewees 5, 6 and 8 realised organisational learning through implementation guides to ensure that project lessons were integrated into organisational learning. Implementation guides serve as checklists to ensure that project learning processes and practices are executed (Duffield & Whitty, 2015). Continuously updating implementation guides as new aspects are learnt and running audit tests ensure that everyone uses and follows the guides.

Regardless of the various approaches above, it could be argued that organisational learning is enabled through one of the four dimensions defined by Hasson et al. (2016). Furthermore, Ajmal et al. (2010) stress that knowledge management is a crucial prerequisite for project success and further that knowledge gained from failures and successes can encourage areas of practice within organisations. This will lead to improved implementation of future projects and expansion of an organisation's project capability if knowledge is a transferable asset within the organisation.

Integrating project management experiential knowledge into organisational learning as a theme arguably underpins the previous themes. Insights from table 8 solidify arguments that best practices, review meetings, implementation guides and supporting document templates encourage a holistic transference of experiential knowledge from project management endeavours.

The themes and insights discussed above present arguments and initial suggestions for transferring project management experiential knowledge into organisational learning. In the following section practical recommendations are made for conceptualising and executing the transferring process.

 

5. PRACTICAL RECOMMENDATIONS

Research often lacks practical relevance without explicitly articulating the significance and application of insights gathered (Cuervo-Cazurra et al., 2013). In this section practical recommendations are made for transferring project management experiential knowledge into organisational learning by applying the themes and insights from the interviews.

5.1 Implementing IT project learning

For implementing organisational learning, organisations need to create and promote an IT project learning culture, driven by senior managers in the organisation as recommended by authors such as Wierzchon (2005) and Foote and Halawi (2018). A continuous IT project learning process should be developed that focuses on translating individual learning into IT project learning. This can help organisations function at a higher level (Kotnour, 2000; Treser, 2016). The research findings presented in section 4 are that each IT project creates a learning opportunity to gain insight into how project teams work, how processes are developed and the delivery of more successful projects. These lessons can create better project teams, implement changes that work and deliver more successful projects. Za et al. (2014) encourage organisations to implement and adopt project learning technologies to achieve effective group learning quickly and efficiently.

5.2 Transferring project management experiential knowledge into organisational learning

The first and most critical step in ensuring that IT project lessons are implemented is to create the awareness that the best way to learn and improve is to conclude past experiences. Trevino and Anantatmula (2008) suggest a five-step continuous learning life cycle which can be used to create a culture of successful IT project delivery. The five steps are as follows:

Collect data: Data collection should occur after each project phase rather than at the end of a project. As revealed in table 6, the majority (75%) of the participants agreed that project lessons should be identified at every stage of the IT project. As data is collected, leaders in the organisation need to ensure that they drive, promote and support creating a project knowledge learning and sharing culture. A process for capturing project lessons must be developed: This can be done through the five-step process by defining the lessons, determining the methods to be used, reviewing and analysing, storing, sharing and distributing the lessons. Knowledge sharing must be promoted through organisational policies and procedures. Employees must be encouraged to provide constructive feedback on the sharing of knowledge within the organisation.

Analyse data: Data needs to be analysed and verified. Table 7 shows that 58 percent of the participants agreed that post-project review meetings are an essential project learning process. Emphasis should be placed on reviewing and analysing the captured data to ensure that only relevant information is captured. This step involves cleaning, transforming and modelling data to determine the information that will be useful for future IT projects and the organisation.

Store data: Storing data is imperative as the data can be accessible by anyone in the organisation. Table 5 shows that a knowledge repository is a powerful tool for knowledge sharing. Furthermore, table 8 provides four approaches to storing IT project lessons to enable organisational learning. Thus, once the data is analysed in step 2, organisations need to ensure that they implement and invest in effective and reliable knowledge sharing processes and technologies. The project lessons are to be stored on a central and accessible repository. The documented project management experiential knowledge should be stored in a database, such as a shared drive or SharePoint. This makes the lessons easily retrievable for project teams to review or add new project lessons.

Disseminate data: The lessons need to be disseminated in real time as soon as they are captured and stored. Similarly, table 5 notes the importance of a knowledge repository for storage and sharing through an accessible organisational platform. The lessons captured and stored need to be shared and distributed across the organisation using knowledge management technologies such as organisational intranets or SharePoint. The organisation can also distribute IT project lessons through reflection on daily activities. IT project teams can review progress, identify areas for improvement and conduct knowledge sharing sessions to discuss and exchange ideas.

Make effective use of the data: As soon as the data is accessible, those who need it or can use it can immediately start using it and thus transfer it into organisational learning. Although table 8 provides four approaches for generating organisational learning, SharePoint, review meetings and implementation guides are arguably the tools for enabling IT project organisational learning. The organisation should develop continuous IT project learning processes to ensure that project lessons are continuously implemented. This can be done through skills improvement, using communities of practice, conducting post-implementation review groups and creating mentor/mentee collaborations. Senior team members should be paired with a junior member for knowledge sharing. Organisational processes are also continuously updated as new lessons are learnt and implemented.

Figure 2 depicts a model that organisations can use to transfer project management experiential knowledge into organisational learning. It incorporates the research findings and recommendations. To implement the model successfully, organisations should ensure that the three key factors, i.e. knowledge management, project learning and organisational learning, are managed effectively as they are the key contributors to each of the steps discussed above.

 

6. CONCLUSION

The levels of government bond prices and yields affect the broad economic and also monetary and fiscal policy environment of any economy.

The research goal was to determine why previous IT project lessons are not seamlessly integrated into new organisational learning by asking how IT project management experiential knowledge is transferred into organisational learning. This study's key findings reveal a lack of a central and standard model used by IT project managers to capture, store and share project management experiential knowledge within the organisation, especially in IT projects. While the lack of centralisation could be evidence of information or operational silos, this study articulates the experiential knowledge transference by establishing six themes (Table 2). From an organisational learning perspective, most participants could not define organisational learning, and others defined it differently. The organisation either uses various processes to store organisational knowledge, or the stored knowledge is shared through knowledge repositories. Regarding project learning and knowledge management in IT projects, the participants understood project lessons and project learning as being done through post-project sessions. Finally, project learning practices were understood by participants to be post-project review meetings, templates and SharePoint to collect, store and retrieve the project lessons.

A life cycle model that incorporates the research findings is proposed (Figure 2). It is posed as a tool that can be used to transfer IT project management experiential knowledge into organisational learning. The model embodies the connection of the insights from the six emergent themes and underpins the link between organisational learning, project knowledge management and project learning.

The theoretical implication is that this research promotes a "how" focus built on the emergent insights from the six themes. The guidelines ensure that previous IT project management experiential knowledge is seamlessly integrated into new IT projects through organisational learning. It is essential to create a culture that promotes knowledge sharing through organisational policies and procedures. Employees must be encouraged to provide constructive feedback regarding the sharing of knowledge. The practical and managerial implications focus on adopting the five-step model (Figure 2) to assist with exploiting IT project management experiential knowledge. Developing a continuous project learning process ensures that the model is amended to reflect changing practices and processes. Proactive and adaptive project management experiential knowledge processes must be actively championed and maintained while being periodically reviewed for effectiveness and integrated to improve organisational processes and success. The implementation of the recommendations and implications involves a paradigm shift from collecting and archiving lessons to turning an organisation into a learning environment where lessons are learnt, collected, analysed, stored and disseminated effectively.

6.1 Limitations and future research

There are a few limitations regarding this study. Although 50 project managers were initially identified and approached, only 12 volunteered or agreed to participate in the study. It would have been ideal to include more participants. The researcher had limited access to the participants as they were geographically dispersed, and face-to-face interviews were not possible. The data analysed is on IT projects, so projects of different types may yield different results. The exploratory qualitative research methodology could be expanded through a quantitative study to confirm or adapt the insights and themes to allow more generalisable implications and recommendations.

 

REFERENCES

Abdul, S., Abdul Kabeer, K. & Musaddiq, R. 2014. Critical success factors of knowledge management systems implementation. KASBITBusiness Journals, 7:64-78.         [ Links ]

Ajmal, M., Helo, P. & Kekäle, T. 2010. Critical factors for knowledge management in project business. Journal of Knowledge Management, 14:156-168.[https://doi.org/10.1108/13673271011015633].         [ Links ]

Anantatmula, V.S. 2006. Improving project performance through leadership and technology. Québec: Project Management Institute. (PMI® Research Conference: New Directions in Project Management; 19 - 21 July).         [ Links ]

Argyris, C. & Schon, D. 1978. Organizational learning: a theory of action perspective. 1st ed. Boston, MA: Addison-Wesley.         [ Links ]

Ayas, K. 1996. Professional project management: a shift towards learning and a knowledge creating structure. International Journal of Project Management, 14, 131-136. [https://doi.org/https://doi.org/10.1016/0263-7863(95)00080-1].         [ Links ]

Bassellier, G., Benbasat, I. & Reich, B. H. 2003. The influence of business managers' it competence on championing IT. Information Systems. Research, 14, 317-336. [https://doi.org/10.1287/isre.14.4.317.24899].         [ Links ]

Blaikie, N. 2009. Designing social research: the logic of anticipation. 2nd ed. Hoboken, New Jersey: Wiley.         [ Links ]

Block, E. S. & Erskine, L. 2012. Interviewing by telephone: specific considerations, opportunities, and challenges. International Journal of Qualitative Methods, 11 , 428-445. [https://doi.org/10.1177/160940691201100409].         [ Links ]

Bourne, L. & Derek, W. H. T. 2004. Advancing project management in learning organizations. The Learning Organization, 11, 226-243. [https://doi.org/10.1108/09696470410532996].         [ Links ]

Cerezo-Narváez, A., Pastor-Fernández, A., Otero-Mateo, M., Ballesteros-Pérez, P. & Rodríguez-Pecci, F. 2021. Knowledge as an organizational asset for managing complex projects: the case of naval platforms. Sustainability, 13, 885. [https://doi.org/10.3390/su13020885].         [ Links ]

Chong, H. G. 2008. Measuring performance of small- and medium-sized enterprises: the grounded theory approach. Journal of Business and Public Affairs, 2, 1-11.         [ Links ]

Cicmil, S. J. K. 1997. Critical factors of effective project management. The TQM Magazine, 9, 390-396. [https://doi.org/10.1108/09544789710186902].         [ Links ]

Coleman, P. 2021. Validity and reliability within qualitative research in the caring sciences. International Journal of Caring Sciences, 14, 2041-2045.         [ Links ]

Cuervo-Cazurra, A., Caligiuri, P., Andersson, U. & Brannen, M. Y. 2013. From the editors: how to write articles that are relevant to practice. Journal of International Business Studies, 44, 285-289. [https://doi.org/10.1057/jibs.2013.17].         [ Links ]

Davenport, T. H. & Prusak, L. 2000. Working knowledge: how organizations manage what they know. Ubiquity, 2000, Article 6. [https://doi.org/10.1145/347634.348775].         [ Links ]

De Castro, R. O., Sanin, C., Levula, A. & Szczerbicki, E. 2022. The development of a conceptual framework for knowledge sharing in agile it projects. Cybernetics and Systems, 53, 529-540. [https://doi.org/10.1080/01969722.2021.2018541].         [ Links ]

De Toni, A. F. & Pessot, E. 2021. Investigating organisational learning to master project complexity: An embedded case study. Journal of Business Research, 129, 541-554. [https://doi.org/10.1016/j.jbusres.2020.03.027].         [ Links ]

Drabble, L., Trocki, K. F., Salcedo, B., Walker, P. C. & Korcha, R. A. 2016. Conducting qualitative interviews by telephone: lessons learned from a study of alcohol use among sexual minority and heterosexual women. Qualitative Social Work: Research and Practice, 15, 118-133. [https://doi.org/10.1177/1473325015585613].         [ Links ]

Duffield, S. & Whitty, S. J. 2015. Developing a systemic lessons learned knowledge model for organisational learning through projects. International Journal of Project Management, 33, 311-324. [https://doi.org/10.1016/uiproman.2014.07.004].         [ Links ]

Fai Pun, K. & Nathai-Balkissoon, M. 2011. Integrating knowledge management into organisational learning: a review of concepts and models. The Learning Organization, 18, 203-223. [https://doi.org/10.1108/09696471111123261].         [ Links ]

Farooq, M. B. & Villiers, C. D. 2017. Telephonic qualitative research interviews: when to consider them and how to do them. Meditari Accountancy Research, 25, 291-316. [https://doi.org/10.1108/MEDAR-10-2016-0083].         [ Links ]

Fauzi, M. A., Anuar, K. F., Rahman, R. A., Jupir, J. & Sapuan, N. M. 2021. Determinants of project management success: view from an emerging economy. Journal of Engineering, Design and Technology, ahead-of-print. [https://doi.org/10.1108/JEDT-04-2021-0223].         [ Links ]

Favoretto, C. & Carvalho, M. M. D. 2021. An analysis of the relationship between knowledge management and project performance: Literature review and conceptual framework. Gestão & Produção, 28, 1-21. [https://doi.org/10.1590/0104-530x4888-20].         [ Links ]

Firestone, J. M. & Mcelroy, M. W. 2004. Organizational learning and knowledge management: the relationship. The Learning Organization, 11, 177-184. [https://doi.org/10.1108/09696470410521628].         [ Links ]

Foote, A. & Halawi, L. A. 2018. Knowledge management models within information technology projects. Journal of Computer Information Systems, 58, 89-97. [https://doi.org/10.1080/08874417.2016.1198941].         [ Links ]

Fosshage, E. 2013. Considerations for implementing an organizational lessons learned process. 1st ed. Albuquerque, NM: NNSA. [https://doi.org/10.2172/1087334].         [ Links ]

Gemino, A., Reich, B. H. & Sauer, C. 2015. Plans versus people: comparing knowledge management approaches in IT-enabled business projects. International Journal of Project Management, 33, 299-310. [https://doi.org/http://dx.doi.org/10.1016/i.iiproman.2014.04.012].         [ Links ]

Haak-Saheem, W. & Tamer, K. D. 2014. The role of knowledge management in creating a culture of learning: The case of dubai municipality. Management Decision, 52, 1611-1629. [https://doi.org/10.1108/MD-08-2013-0427].         [ Links ]

Hanisch, B., Lindner, F., Mueller, A. & Wald, A. 2009. Knowledge management in project environments. Journal of Knowledge Management, 13, 148-160. [https://doi.org/10.1108/13673270910971897].         [ Links ]

Hari, S., Egbu, C. & Kumar, B. 2005. A knowledge capture awareness tool: an empirical study on small and medium enterprises in the construction industry. Engineering, Construction and Architectural Management, 12, 533-567. [https://doi.org/10.1108/09699980510634128].         [ Links ]

Hasson, H., Von Thiele Schwarz, U., Holmstrom, S., Karanika-Murray, M. & Tafvelin, S. 2016. Improving organizational learning through leadership training. Journal of Workplace Learning, 28, 115-129. [https://doi.org/10.1108/JWL-06-2015-0049].         [ Links ]

Huber, G. P. 1991. Organizational learning: the contributing processes and the literatures. Organization Science, 2, 88-115.         [ Links ]

Hussien, J., Abdullateef, M., Kahtan, H. & Sulaiman, R. 2021. Revisiting knowledge transfer for success enterprise system project. Amman: IEEE. (International Conference on Information Technology (ICIT); 14-15 July).         [ Links ]

Jin Xiu, G. 2019. Measuring information system project success through a software-assisted qualitative content analysis. Information Technology and Libraries, 38. [https://doi.org/10.6017/ital.v38i1.10603].         [ Links ]

Johansson, T., Moehler, R. C. & Vahidi, R. 2013. Knowledge sharing strategies for project knowledge management in the automotive sector. Procedia - Social and Behavioral Sciences, 74, 295-304. [https://doi.org/https://doi.org/10.1016/j.sbspro.2013.03.018].         [ Links ]

Joseph, N. & Marnewick, C. 2021. Measuring information systems project complexity: a structural equation modelling approach. Complexity, 2021, 1-15. [https://doi.org/10.1155/2021/5907971].         [ Links ]

Khoza, L. T. 2019a. Managing knowledge leakage during knowledge sharing in software development organisations. South African Journal of Information Management, 21. [https://doi.org/10.4102/sajim.v21i1.1075].         [ Links ]

Khoza, L. T. 2019b. Measuring knowledge sharing behaviour among software development teams. South African Journal of Information Management, 21. [https://doi.org/10.4102/sajim.v21i1.1076].         [ Links ]

Kotnour, T. 2000. Organizational learning practices in the project management environment. International Journal of Quality & Reliability Management, 17, 393-406. [https://doi.org/10.1108/02656710010298418].         [ Links ]

Krylova, K. O., Vera, D. & Crossan, M. 2016. Knowledge transfer in knowledge-intensive organizations: the crucial role of improvisation in transferring and protecting knowledge. Journal of Knowledge Management, 20, 1045-1064. [https://doi.org/10.1108/JKM-10-2015-0385].         [ Links ]

Lee, S., Suh, E. & Lee, M. 2014. Measuring the risk of knowledge drain in communities of practice. Journal of Knowledge Management, 18, 382-395. [https://doi.org/10.1108/JKM-07-2013-0263].         [ Links ]

Liao, S.-H., Fei, W.-C. & Liu, C.-T. 2008. Relationships between knowledge inertia, organizational learning and organization innovation. Technovation, 28, 183-195. [https://doi.org/https://doi.org/10.1016/j.technovation.2007.11.005].         [ Links ]

Malik, A., Froese, F. J. & Sharma, P. 2020. Role of HRM in knowledge integration: towards a conceptual framework. Journal of Business Research, 109, 524-535. [https://doi.org/https://doi.org/10.1016/j.jbusres.2019.01.029].         [ Links ]

Marnewick, A. L. & Joseph, N. 2020. The importance of planning for communication in a project during the requirements process. IEEE Engineering Management Review, 48, 104-112. [https://doi.org/10.1109/EMR.2019.2952563].         [ Links ]

Marsick, V. J. & Watkins, K. E. 1999. Facilitating learning organizations: making learning count. 1st ed. Swansea: Gower.         [ Links ]

Martín Cruz, N., Martín Pérez, V. & Trevilla Cantero, C. 2009. The influence of employee motivation on knowledge transfer. Journal of Knowledge Management, 13, 478-490. [https://doi.org/10.1108/13673270910997132].         [ Links ]

Mclaughlin, S., Paton Robert, A. & Macbeth Douglas, K. 2008. Barrier impact on organizational learning within complex organizations. Journal of Knowledge Management, 12, 107-123. [https://doi.org/10.1108/13673270810859550].         [ Links ]

Nonaka, I. & Takeuchi, H. 1995. The knowledge-creating company: how Japanese companies create the dynamics of innovation. 1st ed. Oxford: Oxford University Press. [https://doi.org/10.1016/0024-6301(96)81509-3].         [ Links ]

Okudan, O., Budayan, C. & Dikmen, I. 2021. A knowledge-based risk management tool for construction projects using case-based reasoning. Expert Systems with Applications, 173, 114776. [https://doi.org/https://doi.org/10.1016/j.eswa.2021.114776].         [ Links ]

Pessot, E. 2017. Project management complexity: an organisational learning perspective. PhD, University of Udine.         [ Links ]

Pettiway, T. & Lyytinen, K. 2018. What promotes learning during information system projects? San Francisco: AIS. (ICIS 2018;13-16 Dec).         [ Links ]

Project Management Institute. 2017. A guide to the project management body of knowledge: PMBOK® guide. 6th ed. Newtown Square: Project Management Institute.         [ Links ]

Qureshi, H. A. & Ünlü, Z. 2020. Beyond the paradigm conflicts: a four-step coding instrument for grounded theory. International Journal of Qualitative Methods, 19, 1609406920928188. [https://doi.org/10.1177/1609406920928188].         [ Links ]

Raymond, L., Bergeron, F., Croteau, A.-M., Ortiz De Guinea, A. & Uwizeyemungu, S. 2020. Information technology-enabled explorative learning and competitive performance in industrial service SMEs: A configurational analysis. Journal of Knowledge Management, 24, 1625-1651. [https://doi.org/10.1108/JKM-12-2019-0741].         [ Links ]

Rowe, S. F. & Sikes, S. 2006. Lessons learned: taking it to the next level. Seattle: Project Management Institute. (PMI® Global Congress; 21-14 Oct).         [ Links ]

Rubin, E. N. 2013. Know-how in the bank: instituting a lessons learned system to capitalize on intellectual assets. Global Business and Organizational Excellence, 32, 36-48. [https://doi.org/https://doi.org/10.1002/joe.21493].         [ Links ]

Santoro, G., Vrontis, D., Thrassou, A. & Dezi, L. 2018. The internet of things: building a knowledge management system for open innovation and knowledge management capacity. Technological Forecasting and Social Change, 136, 347-354. [https://doi.org/https://doi.org/10.1016/j.techfore.2017.02.034].         [ Links ]

Scarbrough, H., Swan, J., Laurent, S., Bresnen, M., Edelman, L. & Newell, S. 2004. Project-based learning and the role of learning boundaries. Organization Studies, 25, 1579-1600. [https://doi.org/10.1177/0170840604048001].         [ Links ]

Seely, B., Seely Brown, J. & Duguid, P. 2000. The social life of information. Work Study, 49. [https://doi.org/10.1108/ws.2000.07949dae.002].         [ Links ]

Shenhar, A. J. 2001. One size does not fit all projects: exploring classical contingency domains. Management Science, 47, 394-414. [https://doi.org/10.1287/mnsc.47.3.394.9772].         [ Links ]

Standish Group. 2018. CHAOS report series - decision latency theory: it is all about the interval. Boston: Standish Group.         [ Links ]

Suppiah, V. & Singh Sandhu, M. 2011. Organisational culture's influence on tacit knowledge-sharing behaviour. Journal of Knowledge Management, 15, 462-477. [https://doi.org/10.1108/13673271111137439].         [ Links ]

Treser, M. 2016. Knowledge management: processes, techniques, and tools. https://elearningindustry.com/knowledge-management-processes-techniques-tools; accessed 11 February 2021].         [ Links ]

Trevino, S. A. & Anantatmula, V. S. 2008. Capitalizing from past projects: the value of lessons learned. Warsaw: Project Management Institute. (PMI® Research Conference: Defining the Future of Project Management; 13-16 July).         [ Links ]

Tukel, O. I., Walter, O. R. & Kremic, T. 2008. Knowledge transfer among projects using a learn-forget model. The Learning Organization, 15, 179-194. [https://doi.org/10.1108/09696470810852339].         [ Links ]

Wagner, W. P., Chung, Q. B. & Baratz, T. 2002. Implementing corporate intranets: lessons learned from two hightech firms. Industrial Management & Data Systems, 102, 140-145. [https://doi.org/10.1108/02635570210421327].         [ Links ]

Wang, C. L. & Ahmed, P. K. 2003. Organisational learning: a critical review. The Learning Organization, 10, 8-17. [https://doi.org/10.1108/09696470310457469].         [ Links ]

Weber, R. O. & Aha, D. W. 2003. Intelligent delivery of military lessons learned. Decision Support Systems, 34, 287-304. [https://doi.org/https://doi.org/10.1016/S0167-9236(02)00122-7].         [ Links ]

Wenger-Trayner, E. & Wenger-Trayner, B. 2015. Introduction to communities of practice: a brief overview of the concept and its uses. https://wenger-trayner.com/introduction-to-communities-of-practice/ [Accessed 11 February 2021].         [ Links ]

Wierzchon, L. 2005. CMMI Process Improvement Project in ComputerLand. Amsterdam: IOS Press. (2005 Conference on Software Engineering: Evolution and Emerging Technologies; 11 May ).         [ Links ]

Wiewiora, A., Chang, A. & Smidt, M. 2020. Individual, project and organizational learning flows within a global project-based organization: exploring what, how and who. International Journal of Project Management, 38, 201-214. [https://doi.org/https://doi.org/10.1016/i.iiproman.2020.03.005].         [ Links ]

Williams, T. 2008. How do organizations learn lessons from projects-and do they? IEEE Transactions on Engineering Management, 55, 248-266. [https://doi.org/10.1109/TEM.2007.912920].         [ Links ]

Wu, C.-H. & Fang, K. 2010. Improving project performance through organisational learning: an empirical study in Taiwan. Technology Analysis & Strategic Management, 22, 261-276. [https://doi.org/10.1080/09537320903498603].         [ Links ]

Wu, D. & Passerini, K. 2013. Uncovering knowledge-based time management practices: implications for project management. International Journal of Managing Projects in Business, 6, 332-348. [https://doi.org/10.1108/17538371311319052].         [ Links ]

Yang, Y., Brosch, G., Yang, B. & Cadden, T. 2020. Dissemination and communication of lessons learned for a project-based business with the application of information technology: a case study with Siemens. Production Planning & Control, 31, 273-286. [https://doi.org/10.1080/09537287.2019.1630682].         [ Links ]

Yin, R. K. 2012. Applications of Case Study Research. 3rd ed. Thousand Oaks: Sage.         [ Links ]

Za, S., Spagnoletti, P. & North-Samardzic, A. 2014. Organisational learning as an emerging process: The generative role of digital tools in informal learning practices. British Journal of Educational Technology, 45, 1023-1035. [https://doi.org/https://doi.org/10.1111/bjet.12211].         [ Links ]

Zahle, J. 2021. Objective data sets in qualitative research. Synthese, 199, 101-117. [https://doi.org/10.1007/s11229-020-02630-2].         [ Links ]

Zapata Cantú, L., Rialp Criado, J. & Rialp Criado, A. 2009. Generation and transfer of knowledge in IT-related SMEs. Journal of Knowledge Management, 13, 243-256. [https://doi.org/10.1108/13673270910988088].         [ Links ]

 

 

* Corresponding author

 

 