SciELO - Scientific Electronic Library Online

 
vol.23 número3The dilemma of climate information for smallholder farmers índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Artigo

Indicadores

Links relacionados

  • Em processo de indexaçãoCitado por Google
  • Em processo de indexaçãoSimilares em Google

Compartilhar


Journal of Energy in Southern Africa

versão On-line ISSN 2413-3051
versão impressa ISSN 1021-447X

J. energy South. Afr. vol.23 no.3 Cape Town  2012

 

Reliability worth assessment of electricity consumers: A South African case study

 

 

Oliver Dzobo; Trevor Gaunt; Ronald Herman

Department of Electrical Engineering, University of Cape Town, South Africa

 

 


ABSTRACT

This paper discusses the results obtained from a customer survey conducted in Cape Town, South Africa, using in-person interviews with approximately 275 sample business customers. The survey included customer interruption cost estimation questions based on the direct costing method. The results obtained show that customer interruption cost for business customers varies with duration and time of occurrence of power interruptions. The variation was shown to be dependent on customer segment. Furthermore, it revealed that business customers can be grouped in terms of the investment they make to mitigate the impact of power interruptions on their activities, such as the use of backup power supplies.

Keywords: Energy Bill, customer interruption cost


 

 

Full text available only in PDF format.

 

 

References

Alvehag, K. (2008). Impact of dependence in risk assessment of power distribution systems, Licentiate Thesis, Royal Institute of Technology, School of Electrical Engineering, Electrical Power Systems, Stockholm, Sweden, 2008.         [ Links ]

Chowdhury, A and Koval, D. O. (1999). Value-Based power system reliability planning, IEEE Transactions on Industry Applications ,vol. 35, no. 2, March/April 1999, pp 305 - 311.         [ Links ]

Chowdhury, A and Koval, D. O. (2001). Application of customer interruption costs in transmission network reliability planning, IEEE Transactions on Industry Applications, Vol. 37, no. 6, November/December 2001, pp 1590 - 1596        [ Links ]

City of Cape Town (2007). State of Energy Report for City of Cape Town 2007, Prepared for the City of Cape Town by Palmer Development Group: http://www.capetown.gov.za.         [ Links ]

Dzobo, O. (2010). Reliability cost and worth assessment of industrial and commercial electricity consumers in Cape Town, M Sc thesis, University of Cape Town, 2010.         [ Links ]

Edimu, M. (2009). Evaluation of reliability indices of a composite power system using probability distribution functions, M Sc Thesis, Department of Electrical Engineering, University of Cape Town, South Africa, 2009        [ Links ]

EPRI (2000). Customer needs for electric power reliability and power quality, EPRI white paper. Technical Report 2000.1000428, Electrical Power Research Institute, Palo Alto, CA, October 2000.         [ Links ]

Eskom (2008). Eskom - Surplus Capacity (visited on 12/08/2008): http://www.eskom.co.za/live/content.php.         [ Links ]

Herman, R and Gaunt, C.T. (2008). Direct and indirect measurement of residential and commercial CIC: Preliminary findings from South Africa Surveys, PMAPS 2008, 2008.         [ Links ]

Integrated Resource Plan (IRP) for Electricity (2010). Cost of Unserved Energy (COUE) - IRP 2010 Input Parameter information sheet (Supply input), Department of Energy, South Africa.         [ Links ]

Jordaan, G. (2006). Segment specific customer interruption costs in the commercial sector, B Sc (Eng) Project thesis, University of Cape Town, 2006.         [ Links ]

Koskolos, N; Megaloconomos, S; Dialynas, E. (1998). Assessment of power interruption costs for the industrial customers in Greece, 8th International Conference on Harmonics and Quality of Power, Anthens, Greece, October 14-16,1998, pp 761-766.         [ Links ]

Navidi, W. (2008). Statistics for Engineers and Scientists, Second edition, McGraw- Hill, New York, 2008.         [ Links ]

NERSA (2008a). NERSA 2008, Interventions to address electricity shortages, January 2008.         [ Links ]

NERSA (2008b). NERSA, Report by the Energy Regulator: Inquiry into the national electricity supply shortage and load shedding, 12 May 2008.         [ Links ]

Statistics South Africa (1993). Standard Industrial Classification of all Economic Activities (SIC), 5th edition, Statistics South Africa, January 1993.         [ Links ]

Sullivan, M; Vardell, T and Johnson, M. (1997). Power interruption costs to industrial and commercial consumers of electricity, IEEE Transactions on Industry Applications, Vol. 33, No. 6, November/December 1997, pp 1448 - 1458.         [ Links ]

Tiedmann, K. (2004). Estimating the value of reliability for business customers, 8th International Conference on Probabilistic Methods Applied to Power Systems, lowa State University, Ames, lowa, September 12-16, 2004.         [ Links ]

 

 

Received 19 May 2011
Revised 16 March 2012

Creative Commons License Todo o conteúdo deste periódico, exceto onde está identificado, está licenciado sob uma Licença Creative Commons