SciELO - Scientific Electronic Library Online

 
vol.22 issue4The mapping of maximum annual energy yield azimuth and tilt angles for photovoltaic installations at all locations in South AfricaLife cycle inventories to assess value chains in the South African biofuels industry author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Article

Indicators

Related links

  • On index processCited by Google
  • On index processSimilars in Google

Share


Journal of Energy in Southern Africa

On-line version ISSN 2413-3051
Print version ISSN 1021-447X

J. energy South. Afr. vol.22 n.4 Cape Town  2011

 

What is the carbon emission factor for the South African electricity grid?

 

 

Randall Spalding-Fecher

Pöyry Management Consulting (Sweden) AB

 

 


ABSTRACT

One of the most important parameters for developing Clean Development Mechanism (CDM) project proposals in the electricity sector (both supply and efficiency) is the standard electricity 'grid emission factor', which represents the carbon dioxide related to a megawatt hour of electricity supplied or saved on the grid. While there are detailed guidelines from the CDM Executive Board on how to calculate this emission factor, the values used in registered CDM projects in South Africa vary widely, both due to changes in the rules over time and also to misapplication of the rules. This paper shows how the application of the latest guidelines gives a 'combined margin emission factor' for South Africa of 0.957 tCO2/MWh in 2009/2010. The variation in emission factors in the literature, as well as the importance of reducing the transaction costs for South African project developers, points to the need for an official published grid emission factor from the CDM host country authority in South Africa, the Designated National Authority (DNA), within the Department of Energy.

Keywords: Clean Development Mechanism, electricity, grid emission factor, carbon emissions, mitigation


 

 

Full text available only in pdf format.

 

Acknowledgements

This paper draws from a variety of research projects funded by the Norwegian Ministry of Foreign Affairs and the Norwegian Embassy in Maputo, Mozambique. The useful inputs provided by Enoch Lerato Liphoto from Eskom were greatly appreciated, as were comments from Gabriella Larson, Francois Sammut and Alberto J Tsamba. Any errors are solely the responsibility of the author.

 

References

Biewald, B. (2005). Using Electric System Operating Margins and Build Margins in Quantification of Carbon Emission Reductions Attributable to Grid Connected CDM Projects. Cambridge: Synapse Economics.         [ Links ]

Bosi, Martina, and Amy Laurence (2002). Road-testing baselines for greenhouse gas mitigation projects in the electric power sector. Paris: International Energy Agency & Organisation for Economic Co-operation and Development.         [ Links ]

Broekhoff, Derik (2007). Expanding Global Emissions Trading: Prospects for Standardized Carbon Offset Crediting. November 15. Washington, D. C.: International Emissions Trading Association. www.ieta.org/ieta/www/pages/getfile.php?docID=2730.         [ Links ]

Econ Pöyry (Randall Spalding-Fecher) (2008). Capacity Building for CDM in Mozambique. Maputo: Norwegian Embassy Mozambique. www.norway.org.mz/DevCoop/Climate+Change+and+EnvironmentClean+Development+Mechanism.htm.         [ Links ]

Ellis, Jane, Jan Corfee-Morlot, and Harald Winkler (2007). CDM: Taking stock and looking forward. Energy Policy 35:15-28.         [ Links ]

Eskom (2010). CDM Calculations. Data requirements for calculating the carbon emission factor (CEF) for the South African grid Eskom [accessed 26 November 2010].         [ Links ] Available from www.eskom.co.za/live/content.php?Item_ID=4226&Revision=en%2F3.

Eskom (2010b). Integrated Report 2010. Johan-nesburg: Eskom Holdings Limited. www.eskom.co.za/annreport10/downloads/eskom_ar2010.pdf.         [ Links ]

Fenhann, J0rgen (2010). CDM Pipeline 1 November 2010. UNEP Riso Centre for Energy, Climate & Sustainable Development [accessed 15 November 2010].         [ Links ] Available from www.cdmpipeline.org.

GHG Protocol (2004). A corporate accounting and reporting standard. Revised edition. March. Geneva & Washington DC: World Business Council for Sustainable Development & World Resources Institute. www.ghgprotocol.org.         [ Links ]

Hayashi, Daisuke, Nicolas Müller, Sven Feige, and Axel Michaelowa (2010). Towards a more standardised approach to baselines and additionality under the CDM. Determining nationally appropriate performance standards and default factors. Commissioned by the UK Department for International Development. May. Zurich: Perspectives GmbH. www.perspec-tives.cc/home/groups/7/Publications/CDM_standard-ised_approach_Full_report.pdf.         [ Links ]

IGES (2010). IGES CDM Project Database. Institute for Global Environmental Strategies, Last Update Updated to 1 October 2010 [accessed 28 October 2010].         [ Links ] Available from www.iges.or.jp/en/cdm/report.html.

IPCC (Intergovernmental Panel on Climate Change) (2006). 2006 IPCC Guidelines for National Greenhouse Gas Inventories: Volume 2: Energy. Geneva. www.ipcc-nggip.iges.or.jp/public/2006gl/vol2.htm.         [ Links ]

Kartha, Sivan, Michael Lazarus, and Martina Bosi (2004). Baseline recommendations for greenhouse gas mitigation projects in the electric power sector. Energy Policy 32:545-566.         [ Links ]

Kossoy, Alexandre, and Philippe Ambrosi (2010). State and Trends of the Carbon Market 2010. Washington, D. C.: World Bank. http://siteresources.worldbank.org/INTCARBONFINANCE/Resources/State_and_Trends_of_the_Carbon_Market_2010_low_res.pdf.         [ Links ]

Lazarus, Michael, Sivan Kartha, and Steve Bernow (2000). Key Issues in Benchmark Baselines for the CDM: Aggregation, Stringency, Cohorts, and Updating. June. Boston: Tellus Institute. www.tellus.org/publications/files/cdmjune2000.pdf.         [ Links ]

NERSA (National Energy Regulator of South Africa) (2005). Electricity supply statistics for South Africa 2005. Pretoria. www.nersa.org.za/Admin/Document/Editor/file/News%20and%20Publications/Publications/Current%20Issues/Electricity%20Supply%20Statistics/2007%20Nersa%20ESS%20Booklet_o.p        [ Links ]

NERSA (National Energy Regulator of South Africa). 2006. Electricity supply statistics for South Africa 2006. Pretoria. www.nersa.org.za/Admin/Document/Editor/file/News%20and%20Publications/Publications/Current%20Issues/Electricity%20Supply%20Statistics/Electricity%20supply%20statistics%202006.pdf        [ Links ]

Sathaye, Jayant, Scott Murtishaw, Lynn Price, Mau-rice Lefranc, Joyashree Roy, Harald Winkler and Randall Spalding-Fecher (2004). Multiproject baselines for evaluation of electric power projects. Energy Policy 32:1303-1317.         [ Links ]

Sharma, Sudhir, and Ram M Shrestha (2006). Baseline for electricity sector CDM projects: Simplifying estimation of operating margin emission factor. Energy Policy 34:4093-4102.         [ Links ]

UNFCCC (United Nations Framework Convention on Climate Change) 2011. Tool to calculate the emission factor for an electricity system. Version 2.2.1. EB63 Annex 19. Bonn. http://cdm.unfccc.int/methodologies/PAmethodologies/tools/am-tool-07-v2.2.1.pdf        [ Links ]

 

 

Received 2 December 2010
Revised 11 October 2011

Creative Commons License All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License