SciELO - Scientific Electronic Library Online

 
vol.122 número5Purification of crude titanium powder produced by metallothermic reduction by acid leaching índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Articulo

Indicadores

Links relacionados

  • En proceso de indezaciónCitado por Google
  • En proceso de indezaciónSimilares en Google

Compartir


Journal of the Southern African Institute of Mining and Metallurgy

versión On-line ISSN 2411-9717
versión impresa ISSN 2225-6253

Resumen

CHEN, H.; AN, F.; WANG, Z.  y  CHEN, X.. Study on the ideal location of a bottom drainage roadway. J. S. Afr. Inst. Min. Metall. [online]. 2022, vol.122, n.5, pp.259-266. ISSN 2411-9717.  http://dx.doi.org/10.17159/2411-9717/1561/2022.

The bottom drainage roadway plays a crucial role in preventing coal and gas outbursts by using underground gas drainage methods. Therefore, it is essential to select the ideal position of the bottom drainage roadway. In this paper use a combination of geological data and numerical simulation to study the ideal position of the bottom drainage roadway, we taking the gas drainage of the first workface of No. 3 coal seam in the Yuxi coal mine in China as an example. The geological study showed a limestone marker layer at an average vertical distance of 14 m from the first mining face. Using this marker layer, the bottom drainage roadway could be excavated without the risk of accidentally exposing the coal seam, and less crosscutting borehole drilling from the bottom drainage roadway would be required. Based on the needs of gas control, the layout of the bottom drainage roadway was selected as an external stagger type. Combined with the numerical simulation results, when located 20 m outside of the mining workface 'footprint' on the horizontal projection, the bottom drainage roadway was a sufficient distance from the stress concentration area during mining of workface 1301, which facilitated roadway maintenance. Furthermore, the length of the crosscutting boreholes is also relatively short, which reduces the amount and cost of drilling. The results of this study are expected to provide a reference for the selection of an ideal position of the bottom drainage roadway in field engineering.

Palabras clave : gas drainage; bottom drainage roadway; geological analysis; numerical simulation.

        · texto en Inglés     · Inglés ( pdf )

 

Creative Commons License Todo el contenido de esta revista, excepto dónde está identificado, está bajo una Licencia Creative Commons