SciELO - Scientific Electronic Library Online

 
vol.122 número4Process optimization of a chrome ore gravity concentration plant for sustainable developmentImprovement of tensile and impact properties of 5083 aluminium weldments using fillers containing nano-Al2O3 and post-weld friction stir processing índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Artigo

Indicadores

Links relacionados

  • Em processo de indexaçãoCitado por Google
  • Em processo de indexaçãoSimilares em Google

Compartilhar


Journal of the Southern African Institute of Mining and Metallurgy

versão On-line ISSN 2411-9717
versão impressa ISSN 2225-6253

Resumo

ANANI, A.; NYAABA, W.  e  CORDOVA, E.. An integrated approach to panel width, fleet size, and change-out time optimization in room-and-pillar mines. J. S. Afr. Inst. Min. Metall. [online]. 2022, vol.122, n.4, pp.181-190. ISSN 2411-9717.  http://dx.doi.org/10.17159/2411-9717/1509/2022.

Optimization of panels, haulage fleet, and waiting area involves deterministic and low-fidelity methods and experiential knowledge. The process is challenging because coal recovery and operational capabilities must be considered in the solution. The approach in this manuscript comprises the development of an integrated stochastic simulation model of a coal room-and-pillar system that addresses these challenges. The decision variables evaluated are panel width, number of shuttle cars, and change-out time (COT). The results show that the mine should implement the shortest possible COT, decreasing the cycle time and thereby increasing productivity and continuous miner (CM) utilization. The highest productivity and CM utilization for a fleet size of three shuttle cars is found in the 15-entry panel width. For the evaluated fleet sizes, the 19-entry panel width is optimal for the four and five shuttle cars. Among the three variables studied, panel width and fleet size had the most significant effects (5% increase) on the CM productivity, cycle time, and utilization.

Palavras-chave : Discrete event simulation; change-out time; panel width; room-and-pillar; fleet size; productivity.

        · texto em Inglês     · Inglês ( pdf )

 

Creative Commons License Todo o conteúdo deste periódico, exceto onde está identificado, está licenciado sob uma Licença Creative Commons