SciELO - Scientific Electronic Library Online

 
vol.120 número6An investigation into the permeability of a PGM slag freeze lining to sulphur índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Artigo

Indicadores

Links relacionados

  • Em processo de indexaçãoCitado por Google
  • Em processo de indexaçãoSimilares em Google

Compartilhar


Journal of the Southern African Institute of Mining and Metallurgy

versão On-line ISSN 2411-9717
versão impressa ISSN 2225-6253

Resumo

MTHEMBU, L.L  e  MEYER, L.D.. Identification of suitable areas for multi-reef operation at Thorncliffe Chrome Mine. J. S. Afr. Inst. Min. Metall. [online]. 2020, vol.120, n.6, pp.355-359. ISSN 2411-9717.  http://dx.doi.org/10.17159/2411-9717/1043/2020.

Thorncliffe Chrome Mine, one of Glencore's Eastern Chrome operations, is currently mining the Middle Group No.1(MG1) chromitite layer and is conducting a pre-feasibility study for an expansion project to mine the Middle Group chromitite No.2 (MG2) layer. This paper focuses on identifying viable areas within the MG2 layer that adhere to the mining, geological, and rock engineering parameters for a safe multiple-reef operation; and establishing efficient ways of accessing and extracting the MG2 chromitite layer. The findings from the multi-reef project at Samancor's Tweefontein Mine (Gouvea, 2013) and Maritz (2015) emphasized that the best layout for a safe and stable multi-reef operation is one where pillars are superimposed. The guidelines by Salamon and Oravecz (1976) were key in the selection criteria for pillar stability. A stage gate analysis was used to identify mineable areas using the success selection criteria for mineability obtained from geotechnical and geostatistical analysis of the assay data and isopach plan. During this study, it was found that the most cost-efficient way of accessing the MG2 chromitite layer is from the MG1 mining horizon through a connecting ramp instead of sinking a shaft. Moreover, using the MG1 infrastructure during the development of the MG2 mining horizon will reduce the project development cost. A bord-and-pillar layout with superimposed pillars will assist in reducing the stress concentrations and interactions between the two mining horizons. With all the considerations being satisfied, it can be concluded that the MG2 layer is viable to mine in a safe manner along with the MG1 layer in a multi-reef environment.

Palavras-chave : multi-reef mining; chromite; superimpose pillars; mineable areas; Bushveld Complex; Middle Group No; 2 layer.

        · texto em Inglês     · Inglês ( pdf )

 

Creative Commons License Todo o conteúdo deste periódico, exceto onde está identificado, está licenciado sob uma Licença Creative Commons