SciELO - Scientific Electronic Library Online

 
vol.120 número3Extending the protection range in protective seam mining under the influence of gas drainageMeasuring and modelling entrainment in rougher and cleaner batch flotation índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Articulo

Indicadores

Links relacionados

  • En proceso de indezaciónCitado por Google
  • En proceso de indezaciónSimilares en Google

Compartir


Journal of the Southern African Institute of Mining and Metallurgy

versión On-line ISSN 2411-9717
versión impresa ISSN 2225-6253

Resumen

LEVINSON, Z.  y  DIMITRAKOPOULOS, R.. Adaptive simultaneous stochastic optimization of a gold mining complex: A case study. J. S. Afr. Inst. Min. Metall. [online]. 2020, vol.120, n.3, pp.221-232. ISSN 2411-9717.  http://dx.doi.org/10.17159/2411-9717/829/2020.

An innovative strategic mine planning approach was applied to a multi-mine and multi-process gold mining complex that simultaneously considers feasible capital investment alternatives and capacity management decisions. The simultaneous stochastic optimization framework determines the extraction sequence, stockpiling, processing stream, blending, waste management, and capital investment decisions in a single mathematical model. A production schedule branches and adapts to uncertainty based on the likelihood of purchasing a number of feasible investment alternatives that may improve mill throughput or blending, or increase the tailings capacity. Additionally, the mining rate is determined simultaneously by selecting the number of trucks and shovels required to maximize the value of the operation. The mining complex contains several sources - two open-pit gold mines and externally sourced ore - stockpiles, waste dumps, tailings, and three different processing streams. The simultaneous optimization framework integrates the blending of sulphates, carbonates, and organic carbon at the autoclave for refractory ore while managing acid consumption. The production schedule generated branches over an investment in the autoclave expansion; the first branch undertakes a capacity expansion at the autoclave resulting in a 6.4% increase in NPV, whereas the second branch results in a 27.5% increase in NPV without the investment. The adaptive approach is compared to a base case production schedule generated using a non-branching two-stage stochastic integer program.

Palabras clave : mining complex; simultaneous stochastic optimization; capital investments.