SciELO - Scientific Electronic Library Online

 
vol.119 issue2Characteristics, recovery and provenance of rutile from the Namakwa Sands heavy mineral deposit, South Africa author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Article

Indicators

Related links

  • On index processCited by Google
  • On index processSimilars in Google

Share


Journal of the Southern African Institute of Mining and Metallurgy

On-line version ISSN 2411-9717
Print version ISSN 2225-6253

Abstract

KHATI, T.  and  MATABANE, M.. Kimberlite-country rock contact delineation at Finsch Diamond Mine. J. S. Afr. Inst. Min. Metall. [online]. 2019, vol.119, n.2, pp.97-103. ISSN 2411-9717.  http://dx.doi.org/10.17159/2411-9717/2019/v119n2a1.

Accurate delineation of the contact between a kimberlite pipe and country rock at production level depths is a challenge due to limited geological data. Geological information is obtained from widely spaced diamond core boreholes which are drilled either from surface or from higher mining levels within the pipe. Kimberlite pipe/country rock contacts are notoriously irregular and variable, further reducing the confidence in contact positions defined by the drill-holes. At Finsch Diamond Mine (FDM), the opportunity arose to further improve the confidence in the contact positions relative to the planned slot (end) positions of each sublevel cave tunnel during the development stage of these tunnels. As a result, the accuracy of the 3D geological model has improved. The use of diamond drill core for this purpose is expensive due to site establishment requirements. The lengthy time taken during site establishment also delays the development of tunnels and support cycles, thereby extending the completion dates. FDM has reduced delays during development by adopting percussion drilling, in conjunction with gamma ray logging. The S36 drill rig is mounted on a moveable platform and does not require a costly and lengthy site establishment. The holes are generally drilled (0°/flat) on grade elevation, and these holes could also be drilled from the rim tunnels (developed in waste) into the kimberlite pipe. A single-boom production drill rig is normally used to drill holes about 20 m in length. On completion of the contact delineation drilling, gamma logging of the holes is conducted using the GeoVista geophysical sonde (or probe) to log the natural gamma signature of the dolomite/ kimberlite contact. The advantage of this tool is that the readings are continuous within centimetre intervals, and due to contrasting characteristics between kimberlite (rich in clay minerals) and dolomite, the contact position can be determined accurately. The better definition of contact positions also adds value to tunnel stopping distance in terms of developing the tunnel's slot at the optimum distance from the contact (easier blasting of longhole rings, avoidance of contact overbreak and premature waste ingress, and other matters relating to extraction of ore from these tunnels). This method is highly successful and has reduced development costs (on-time completion), improved definition of the pipe's contact position for geological modelling, improved blast design, and mitigated early waste ingress by maintaining the contact's integrity.

Keywords : natural gamma logging; contact delineation; kimberlite-dolomite contact; middling; waste ingress.

        · text in English     · English ( pdf )

 

Creative Commons License All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License