SciELO - Scientific Electronic Library Online

 
vol.117 número8Prediction of blast induced ground vibrations in Karoun III power plant and dam: A neural network índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Artigo

Indicadores

Links relacionados

  • Em processo de indexaçãoCitado por Google
  • Em processo de indexaçãoSimilares em Google

Compartilhar


Journal of the Southern African Institute of Mining and Metallurgy

versão On-line ISSN 2411-9717
versão impressa ISSN 2225-6253

Resumo

SNYDERS, C.A.; AKDOGAN, G.; BRADSHAW, S.M.  e  VAN WYK, A.P.. Gold CIP and CIL process optimization in a capital constraint environment. J. S. Afr. Inst. Min. Metall. [online]. 2017, vol.117, n.8, pp.819-828. ISSN 2411-9717.  http://dx.doi.org/10.17159/2411-9717/2017/v117n8a13.

This article focuses on the use of a model in combination with economic analysis to extract maximum value out of current gold operations, without the need for additional capital. Two South African case studies (CIP and CIL) are presented to show that an optimum point of operation exists. This optimum point of operation, however, depends on several economic factors such as the gold price, exchange rate, and utility costs in combination with plant conditions such as the feed rate and Au grade. As these parameters fluctuate, the operating conditions will have to be adjusted to achieve the maximum value. Operating at a maximum will require regular decision-making and adjusting of operating conditions, especially in times of a constrained economy.

Palavras-chave : gold recovery; optimization; CIP; RIP; economic; analysis; modelling.