SciELO - Scientific Electronic Library Online

 
vol.114 número6Summary of results of ACARP project on cross-belt cutters índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Artigo

Indicadores

Links relacionados

  • Em processo de indexaçãoCitado por Google
  • Em processo de indexaçãoSimilares em Google

Compartilhar


Journal of the Southern African Institute of Mining and Metallurgy

versão On-line ISSN 2411-9717
versão impressa ISSN 2225-6253

Resumo

BLUHM, S; MOREBY, R; VON GLEHN, F  e  PASCOE, C. Life-of-mine ventilation and refrigeration planning for Resolution Copper Mine. J. S. Afr. Inst. Min. Metall. [online]. 2014, vol.114, n.6, pp.497-503. ISSN 2411-9717.

Resolution Copper Mine is planned to be a 2000 m deep panel cave mine with virgin rock temperatures above 80°C in rock with a high crystalline silica content. The planned run-of-mine production rate is 120 kt/day. The project is in prefeasibility evaluation. This paper discusses features of the ventilation system design, which include multiple ventilation shafts with total flow of about 3000 m3/s and both surface and underground refrigeration systems with more than 140 MW total capacity. This will be a very challenging mine to ventilate, but this work has demonstrated that it will be technically achievable with the application of existing technology.

Palavras-chave : mine ventilation; mine refrigeration; dust management; heat load; modelling.

        · texto em Inglês     · Inglês ( pdf )

 

Creative Commons License Todo o conteúdo deste periódico, exceto onde está identificado, está licenciado sob uma Licença Creative Commons