SciELO - Scientific Electronic Library Online

 
vol.110 issue1A matched case-control study of occupational injury in underground coalmine workersNew technology for real-time in-stope safety management author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Article

Indicators

Related links

  • On index processCited by Google
  • On index processSimilars in Google

Share


Journal of the Southern African Institute of Mining and Metallurgy

On-line version ISSN 2411-9717
Print version ISSN 2225-6253

Abstract

SPOTTISWOODE, S.M.. Mine seismicity: Prediction or forecasting?. J. S. Afr. Inst. Min. Metall. [online]. 2010, vol.110, n.1, pp.11-20. ISSN 2411-9717.

Much as one hopes to predict whether damaging seismicity might occur somewhere in the next shift, this is not possible at present. Recently, an analysis of seismicity at two mines has shown that a small increase in seismicity occasionally occurs before both large and small events. This analysis is extended here to five mines, with the same results. Earthquake seismologists forecast hazard in terms of the average incidence of earthquakes over the last 50 years, adjusted on an hourly basis according to the possibility of aftershocks of events that have happened. The rate of seismicity in any area remains approximately constant when expressed as seismicity per area mined, or better still, per unit of elastic strain energy released. It is suggested that seismic hazard in mines be estimated using historical seismicity and forward modelling, adjusted according to the possibility of aftershocks. In summary, medium-term forecasting of seismicity is viable; short-term prediction of large events is not

        · text in English     · English ( pdf )

 

Creative Commons License All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License