SciELO - Scientific Electronic Library Online

 
vol.109 issue11 author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Article

Indicators

Related links

  • On index processCited by Google
  • On index processSimilars in Google

Share


Journal of the Southern African Institute of Mining and Metallurgy

On-line version ISSN 2411-9717
Print version ISSN 2225-6253

Abstract

NISBETT, A.; BAXTER, K.; MARTE, K.  and  URBANI, M.. Flowsheet considerations for copper cobalt projects. J. S. Afr. Inst. Min. Metall. [online]. 2009, vol.109, n.11, pp.641-646. ISSN 2411-9717.

The Copperbelt areas of Zambia and the Democratic Republic of Congo (DRC) have recently been seeing the development of a significant number of new projects. Due to the current economic climate, some of these projects have been delayed but the region remains an important resource for copper and cobalt for future years. Many of these projects will utilize an agitation leach followed by solvent extraction and electrowinning to recover both copper and cobalt. The flowsheet route for copper is fairly well established while the processing options for cobalt vary considerably depending on the final product (metal or salt) the operator wishes to make. The mineralogy of ores in the area is typically associated with high gangue acid consumption during the leaching process. This has resulted in acid availability to the area being constrained and acid prices have risen accordingly. Agitation leach circuits, typically, have a tight water balance which needs to be maintained and a bleed of process liquor needs to be continuously removed from the circuit in order to maintain this balance. This bleed, typically, contains fairly high levels of acid and requires neutralization prior to tailings disposal or secondary metal recovery. It is, therefore, desirable to minimize the acid concentration in this bleed stream in order to decrease total acid requirements and neutralization costs for the process plant. An in depth case study by Cognis and Bateman Engineering evaluated three different flowsheets with the aim of determining relative operating costs between the three alternatives, together with differences in plant capital cost requirements.

        · text in English     · English ( pdf )

 

Creative Commons License All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License