SciELO - Scientific Electronic Library Online

 
vol.31 número2Towards management excellence: the case of South African professional bodiesThe multi-period electric home healthcare routeing and scheduling problem with nonlinear charging índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Artigo

Indicadores

Links relacionados

  • Em processo de indexaçãoCitado por Google
  • Em processo de indexaçãoSimilares em Google

Compartilhar


South African Journal of Industrial Engineering

versão On-line ISSN 2224-7890
versão impressa ISSN 1012-277X

Resumo

CHITONGO, A.M.  e  PRETORIUS, L.. Impact of project participants' competition on project performance. S. Afr. J. Ind. Eng. [online]. 2020, vol.31, n.2, pp.76-91. ISSN 2224-7890.  http://dx.doi.org/10.7166/31-2-2258.

The use of competition as a conflict-handling style aimed at win-lose end results has been highlighted by some researchers to be common during project execution. However, the impact of such competition on project performance remains largely under-researched. This article seeks to address this gap in the existing literature. A system dynamics simulation model of competition between two key project participants (client and engineering consultant) was formulated through a mixed methods research methodology incorporating the system dynamics approach. Data gathered for two sets of unique projects were used separately to conduct model calibrations, simulation experiments, and impact analyses. The results suggested that the competition negatively influenced project performance.

        · resumo em Africaner     · texto em Inglês     · Inglês ( pdf )

 

Creative Commons License Todo o conteúdo deste periódico, exceto onde está identificado, está licenciado sob uma Licença Creative Commons