SciELO - Scientific Electronic Library Online

 
vol.30 número2The role of relationship management in the successful outsourcing of maintenanceNew heuristics for minimising total completion time and the number of tardy jobs criteria on a single machine with release time índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Articulo

Indicadores

Links relacionados

  • En proceso de indezaciónCitado por Google
  • En proceso de indezaciónSimilares en Google

Compartir


South African Journal of Industrial Engineering

versión On-line ISSN 2224-7890
versión impresa ISSN 1012-277X

Resumen

SIRIRAM, R.. A project management investigative framework establishing links for better project outcomes. S. Afr. J. Ind. Eng. [online]. 2019, vol.30, n.2, pp.100-114. ISSN 2224-7890.  http://dx.doi.org/10.7166/30-2-2064.

This paper makes a contribution to knowledge by proposing a project management (PM) investigative framework with seven constructs and 60 sub-scales. The research consisted of an eight-step process. First, a project management assessment (PMA) tool was developed through an extensive literature review. Second, the PMA tool was evaluated through an expert panel. Third, the PMA tool was used to evaluate 330 projects, producing 330 PMA results. Fourth, an investigative framework linking the different PMA constructs was developed and tested. Structural equation modelling (SEM) was used to find links in the investigative framework for each of the PMA constructs, and 19 hypotheses were tested, all of which were accepted. The results provide interesting lessons for researchers and for project management practitioners. Finally, a discussion of the results, the study's limitations, and suggestions for further research are presented. .

        · resumen en Africano     · texto en Inglés     · Inglés ( pdf )

 

Creative Commons License Todo el contenido de esta revista, excepto dónde está identificado, está bajo una Licencia Creative Commons