SciELO - Scientific Electronic Library Online

 
vol.30 issue2The role of relationship management in the successful outsourcing of maintenanceNew heuristics for minimising total completion time and the number of tardy jobs criteria on a single machine with release time author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Article

Indicators

Related links

  • On index processCited by Google
  • On index processSimilars in Google

Share


South African Journal of Industrial Engineering

On-line version ISSN 2224-7890
Print version ISSN 1012-277X

Abstract

SIRIRAM, R.. A project management investigative framework establishing links for better project outcomes. S. Afr. J. Ind. Eng. [online]. 2019, vol.30, n.2, pp.100-114. ISSN 2224-7890.  http://dx.doi.org/10.7166/30-2-2064.

This paper makes a contribution to knowledge by proposing a project management (PM) investigative framework with seven constructs and 60 sub-scales. The research consisted of an eight-step process. First, a project management assessment (PMA) tool was developed through an extensive literature review. Second, the PMA tool was evaluated through an expert panel. Third, the PMA tool was used to evaluate 330 projects, producing 330 PMA results. Fourth, an investigative framework linking the different PMA constructs was developed and tested. Structural equation modelling (SEM) was used to find links in the investigative framework for each of the PMA constructs, and 19 hypotheses were tested, all of which were accepted. The results provide interesting lessons for researchers and for project management practitioners. Finally, a discussion of the results, the study's limitations, and suggestions for further research are presented. .

        · abstract in Afrikaans     · text in English     · English ( pdf )

 

Creative Commons License All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License