SciELO - Scientific Electronic Library Online

 
vol.29 issue2The scope of Genetic Algorithms in dealing with facility layout problemsManaging risk for success in a South African engineering and construction project environment author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Article

Indicators

Related links

  • On index processCited by Google
  • On index processSimilars in Google

Share


South African Journal of Industrial Engineering

On-line version ISSN 2224-7890
Print version ISSN 1012-277X

Abstract

NAIDOO, E.; PADAYACHEE, J.  and  BRIGHT, G.. A multi-stage optimisation method for the management of an on-demand fixture manufacturing cell for mass customisation production systems. S. Afr. J. Ind. Eng. [online]. 2018, vol.29, n.2, pp.52-64. ISSN 2224-7890.  http://dx.doi.org/10.7166/29-2-1824.

Die implementering van herkonfigureerbare hegstukke is 'n belangrike fasiliteerder van massaproduksie aanpassing. Tradisionele skeduleringstegnieke oorweeg nie herkonfigureerbare hegstukke omvattend nie. Hierdie artikel beskryf 'n multi-fase optimiseringsmetode wat hersirkulering van herkonfigureerbare hegstukke in 'n massa aanpassing produksie stelsel bestuur. Die metode is gegrond op 'n op-bestelling vervaardigingsel wat gedien het as 'n komponentprosesseringsel . Die metode bestaan uit drie fases: die gebruik maak van gevestigde tegnieke soos k-gemiddeld groepering en hiërargiese groepering; en 'n nuwe gemengde heelgetal lineêre programmering model om operasionele volgordes te optimiseer. Minimering van die totale niksdoentyd (en dus totale maaktyd) is gebruik as die maatstaf van vertoning.

        · abstract in English     · text in English     · English ( pdf )

 

Creative Commons License All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License