SciELO - Scientific Electronic Library Online

 
vol.29 número2Investigating of eco- and energy-efficient lubrication strategies for the drilling of light metal alloysA location-inventory model including delivery delay cost and capacity constraints in a stochastic distribution network índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Artigo

Indicadores

Links relacionados

  • Em processo de indexaçãoCitado por Google
  • Em processo de indexaçãoSimilares em Google

Compartilhar


South African Journal of Industrial Engineering

versão On-line ISSN 2224-7890
versão impressa ISSN 1012-277X

Resumo

KIM, B.-Y.; SEOK, H.  e  KANG, Y.. An intelligent RTP-based household electricity scheduling with a genetic algorithm in a smart grid. S. Afr. J. Ind. Eng. [online]. 2018, vol.29, n.2, pp.43-51. ISSN 2224-7890.  http://dx.doi.org/10.7166/29-2-1813.

Electricity scheduling for households based on real-time pricing (RTP) allows flexible and efficient consumption planning. However, this creates errors in predicted costs. Therefore this study used a genetic algorithm (GA) to reduce the error in predicted costs and suggested a model that offered better consumption planning. This model comprises a provider that supplies electricity and a subscriber that consumes electricity. Each subscriber has an energy management controller (EMC) that selects the optimal electricity scheduling. The provider and subscriber exchange real-time predicted costs and consumption plans to achieve an appropriate balance. During this process, the aforementioned prediction error - i.e., the difference between the predicted cost for each time slot and the final actual cost - occurs. This was addressed in this study using a GA. As a result, the presented model produced consumption plans with costs that were 22.60 per cent lower than the non-scheduled case, and 3.34 per cent lower than the model from a previous study. Furthermore, the fairness for each subscriber was improved by 15.96 per cent compared with the non-scheduled case, and by 0.62 per cent compared with the previous study model.

        · resumo em Africaner     · texto em Inglês     · Inglês ( pdf )

 

Creative Commons License Todo o conteúdo deste periódico, exceto onde está identificado, está licenciado sob uma Licença Creative Commons