SciELO - Scientific Electronic Library Online

 
vol.25 número1Quality performance: The case of construction projects in the electricity industry in KenyaHybrid supply chains in emerging markets: The case of the Mexican auto industry índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Articulo

Indicadores

Links relacionados

  • En proceso de indezaciónCitado por Google
  • En proceso de indezaciónSimilares en Google

Compartir


South African Journal of Industrial Engineering

versión On-line ISSN 2224-7890
versión impresa ISSN 1012-277X

Resumen

MARSUDI, M.  y  SHAFEEK, H.. Cycle time analysis of tipping trailer frame: A case study in a heavy equipment industry. S. Afr. J. Ind. Eng. [online]. 2014, vol.25, n.1, pp.176-188. ISSN 2224-7890.

A key element with which manufacturing industries should concern themselves in respect of cost and efficiency of operation is the cycle time for preparing their products. A reduction in operational time can result in dramatic improvements in both cost and efficiency. Unfortunately, cycle time problems are sometimes difficult to analyse: there are many factors related to this parameter. This paper presents a cycle time analysis of a tipping trailer frame in a heavy equipment industry. The cycle time analysis, based on the cycle time data collected by a time study, together with the use of an Arena software simulation, is outlined. From the results of this study, it was found that the manufacturing cycle time was 56 hours, and that resources were under-utilised.

        · resumen en Africano     · texto en Inglés     · Inglés ( pdf )

 

Creative Commons License Todo el contenido de esta revista, excepto dónde está identificado, está bajo una Licencia Creative Commons