SciELO - Scientific Electronic Library Online

 
vol.20 issue2 author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Article

Indicators

Related links

  • On index processCited by Google
  • On index processSimilars in Google

Share


South African Journal of Industrial Engineering

On-line version ISSN 2224-7890
Print version ISSN 1012-277X

Abstract

DU PREEZ, M.  and  LOTTERING, T.. A social cost benefit analysis of extending an existing recycling plant to accommodate the recycling of the plastic fraction of cable scrap. S. Afr. J. Ind. Eng. [online]. 2009, vol.20, n.2, pp.179-192. ISSN 2224-7890.

This paper investigates the economic efficiency of extending an existing cable waste recycling plant to accommodate the recycling of the plastic fraction of cable waste. The paper shows that when a cost benefit analysis (CBA) is carried out, the decision-making criteria generate conflicting results. More specifically, the net present value (NPV) is greater than zero, the internal rate of return (IRR) is less than the social discount rate, and the benefit cost ratio (BCR) is less than unity. Based on these results, one is unable to provide unqualified support for the project.

        · abstract in Afrikaans     · text in English     · English ( pdf )

 

Creative Commons License All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License