SciELO - Scientific Electronic Library Online

 
vol.39 issue1Generating high-resolution digital elevation models for wetland research using Google EarthTM imagery: an example from South AfricaThreats and opportunities for post-closure development in dolomitic gold-mining areas of the West Rand and Far West Rand (South Africa) - a hydraulic view part 2: opportunities author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Article

Indicators

Related links

  • On index processCited by Google
  • On index processSimilars in Google

Share


Water SA

On-line version ISSN 1816-7950
Print version ISSN 0378-4738

Abstract

RIDDELL, ES; EVERSON, C; CLULOW, A  and  MENGISTU, M. The hydrological characterisation and water budget of a South African rehabilitated headwater wetland system. Water SA [online]. 2013, vol.39, n.1, pp.57-66. ISSN 1816-7950.

This paper presents a synopsis of the findings of a valley bottom wetland monitoring study in which dominant hydrological processes maintaining the system are quantitatively defined. The Craigieburn-Manalana is a wetland subjected to technical rehabilitation, at the headwaters of the Sand River in the lowveld savanna region of South Africa. Findings include the identification of a rapid water delivery mechanism from the surrounding hillslopes to the wetland following a threshold-exceeding precipitation event, when hillslope-toe soil matric potential is close to 0, leading to a raising of the wetland water table by >0.7 m within 3 h. A summary of quantified fluxes and associated water budget of the wetland and its contributing catchment is developed. It is revealed that this wetland does not necessarily conform to the typical assumptions that wetlands augment low flows. Surface layer scintillometry shows actual wetland evapotranspiration to dominate the water budget during the dry season (2.3-3.5 mm/d) compared to its contributing catchment (0.9-2.2 mm/d), whilst stream discharge had ceased. Hydrograph separation, based on stable isotopes (18O), revealed that the wetland does not attenuate peak flows during the summer rains when the wetlands soil moisture deficit is close to 0, since more than 66% of stream discharge comprised event water. These results are discussed within the context of current hydrological understanding of southern African headwater wetlands, such as dambos.

Keywords : hillslope processes; hydro-geomorphology; water budget; dambos; rehabilitation; wetlands.

        · text in English     · English ( pdf )

 

Creative Commons License All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License