SciELO - Scientific Electronic Library Online

 
vol.60 número2Applications of response sensitivity analysis in earthquake engineeringCharacterising the ductility and fatigue crack resistance potential of asphalt mixes based on the laboratory direct tensile strength test índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Articulo

Indicadores

Links relacionados

  • En proceso de indezaciónCitado por Google
  • En proceso de indezaciónSimilares en Google

Compartir


Journal of the South African Institution of Civil Engineering

versión On-line ISSN 2309-8775
versión impresa ISSN 1021-2019

Resumen

PARTHASARATHY, M K; MURUGASAN, R  y  VASAN, Ramya. Modelling manpower and equipment productivity in tall residential building projects in developing countries. J. S. Afr. Inst. Civ. Eng. [online]. 2018, vol.60, n.2, pp.23-33. ISSN 2309-8775.  http://dx.doi.org/10.17159/2309-8775/2018/v60n2a3.

This study is aimed at developing productivity models based on the combined usage of manpower and equipment resources in construction for tall residential building projects in India. Data was collected from 52 tall residential building projects in different locations for a consecutive period of 18 months for the five basic activities of construction: concreting, reinforcement, formwork, blockwork and plastering. Multiple linear regression analysis was used to develop 15 models - three models each in different conditions for the five basic construction activities for manpower and equipment productivity, and were validated with independent field data. In addition, the factors affecting productivity of manpower and equipment were analysed through a qualitative study by collecting and examining responses to questionnaires from 96 respondents involved in the 52 projects. The study found that improper planning of work was the most important factor affecting the productivity in tall residential building projects. The models developed in the study, and the analysis of factors affecting productivity will be useful to cost engineers and project managers to estimate the productivity of resources in tall residential building projects in India and other developing countries where similar conditions prevail.

Palabras clave : construction; residential buildings; tall buildings; productivity; modelling.

        · texto en Inglés     · Inglés ( pdf )

 

Creative Commons License Todo el contenido de esta revista, excepto dónde está identificado, está bajo una Licencia Creative Commons