SciELO - Scientific Electronic Library Online

 
vol.114 número6A methodology for determining the erosion profile of the freeze lining in submerged arc furnace índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Artigo

Indicadores

Links relacionados

  • Em processo de indexaçãoCitado por Google
  • Em processo de indexaçãoSimilares em Google

Compartilhar


Journal of the Southern African Institute of Mining and Metallurgy

versão On-line ISSN 2411-9717
versão impressa ISSN 0038-223X

Resumo

BLUHM, S; MOREBY, R; VON GLEHN, F  e  PASCOE, C. Life-of-mine ventilation and refrigeration planning for Resolution Copper Mine. J. S. Afr. Inst. Min. Metall. [online]. 2014, vol.114, n.6, pp.497-503. ISSN 2411-9717.

Resolution Copper Mine is planned to be a 2000 m deep panel cave mine with virgin rock temperatures above 80°C in rock with a high crystalline silica content. The planned run-of-mine production rate is 120 kt/day. The project is in prefeasibility evaluation. This paper discusses features of the ventilation system design, which include multiple ventilation shafts with total flow of about 3000 m3/s and both surface and underground refrigeration systems with more than 140 MW total capacity. This will be a very challenging mine to ventilate, but this work has demonstrated that it will be technically achievable with the application of existing technology.

Palavras-chave : mine ventilation; mine refrigeration; dust management; heat load; modelling.

        · texto em Inglês     · Inglês ( pdf )

 

Creative Commons License Todo o conteúdo deste periódico, exceto onde está identificado, está licenciado sob uma Licença Creative Commons