SciELO - Scientific Electronic Library Online

 
vol.113 número10The use of change management and behaviour-based training in an improvement project aimed at creating organizational sustainability in a multicultural mining environment in ZambiaA framework to simplify the management of throughput and constraints índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Artigo

Indicadores

Links relacionados

  • Em processo de indexaçãoCitado por Google
  • Em processo de indexaçãoSimilares em Google

Compartilhar


Journal of the Southern African Institute of Mining and Metallurgy

versão On-line ISSN 2411-9717

Resumo

CLAASSEN, J.O.. Yield improvement at a mid-sized coal mine in the Witbank coalfields. J. S. Afr. Inst. Min. Metall. [online]. 2013, vol.113, n.10, pp. 761-768. ISSN 2411-9717.

A study was initiated and solutions implemented to address the root causes of a 30°/o^J0°/o lower than predicted product yield achieved at a Mpumalanga coal mine. A holistic MRTM approach, which focused on improving exploration, geological sampling and analysis, geological modelling, planning, mining, and beneficiation practices, was used. The study indicated that deviations in the planned versus actual yields at the DMS plant were caused mainly by incorrect geological yield predictions, high and variable levels of dilution, and near-dense material, as well as the textural properties of the ore.

Palavras-chave : MRTM; mining value chain improvement; Witbank coalfields; complex geology.

        · texto em Inglês     · Inglês ( pdf )

 

Creative Commons License All the contents of this journal, except where otherwise noted, is licensed under a Creative Commons Attribution License