SciELO - Scientific Electronic Library Online

 
vol.112 número12Optimization of the transition from open-pit to underground operation in combined mining using (0-1) integer programmingA newly developed plaster stemming method for blasting índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Artigo

Indicadores

Links relacionados

  • Em processo de indexaçãoCitado por Google
  • Em processo de indexaçãoSimilares em Google

Compartilhar


Journal of the Southern African Institute of Mining and Metallurgy

versão On-line ISSN 2411-9717
versão impressa ISSN 0038-223X

Resumo

ABDOLLAHISHARIF, J.; BAKHTAVAR, E.  e  ANEMANGELY, M.. Optimal cut-off grade determination based on variable capacities in open-pit mining. J. S. Afr. Inst. Min. Metall. [online]. 2012, vol.112, n.12, pp.1065-1069. ISSN 2411-9717.

SYNOPSIS Optimal cut-off grade is one of the most critical parameters in open-pit mine design because it defines the ore and waste and thus determines the maximum net present value possible from the mining operation. Although the algorithm presented by Lane (Choosing the optimum cut-off grade. Colorado School of Mines Quarterly, vol. 59, no. 4, 1964. pp. 811-829) is the most common one in the literature, it does assume constant capacities of the mine, processing, and refinery. In this paper, Lane's original algorithm has been modified to consider variable processing capacities in order to determine the optimal cut-off grade in open-pit mines. The new algorithm proposed here is compared to both Lane's original algorithm and to a previous modification that incorporated rehabilitation costs into the cut-off grade estimation. The algorithm proposed here that permits variable processing capacities is shown to be superior for the determination of optimal cut-off grade to both these previous versions. In addition, a computer-based program was developed in Microsoft Office Excel© to calculate the optimal cut-off grade as proposed here.

Palavras-chave : optimization; cut-off grade; variable capacity-based; NPV; open-pit mining..

        · texto em Inglês     · Inglês ( pdf )

 

Creative Commons License Todo o conteúdo deste periódico, exceto onde está identificado, está licenciado sob uma Licença Creative Commons