SciELO - Scientific Electronic Library Online

 
vol.112 issue6Fluidization behaviour of various titania feedstocksA case study application of linear programming and simulation to mine planning author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Article

Indicators

    Related links

    • On index processCited by Google
    • On index processSimilars in Google

    Bookmark

    Journal of the Southern African Institute of Mining and Metallurgy

    Print version ISSN 0038-223X

    Abstract

    PEREIRA, S.P; COSTA, J.F.C.L; SALVADORETTI, P  and  KOPPE, J. Mining simulation for room and pillar coal operation. J. S. Afr. Inst. Min. Metall. [online]. 2012, vol.112, n.6, pp. 473-476. ISSN 0038-223X.

    The mechanized mining cycle using loaders and shuttle cars had its peak in terms of usage in the mining industry during 1950 through 1960. In Brazil, this system is still used at underground coal mines in southern Santa Catarina coal basin. With the aim of investigating the benefits of a new mining scheme using the room and pillar method for these local mines, a computational simulator model was developed in order to investigate the mining cycle. This paper presents the methodology used to develop the simulator and the results that the simulation shows regarding impact of the proposed new scheme on mining productivity.

    Keywords : production simulation; underground coal mining.

            · text in English     · pdf in English