SciELO - Scientific Electronic Library Online

 
vol.115 número4Coal clearance system at Zondagsfontein Colliery índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Journal

Artigo

Indicadores

    Links relacionados

    • Em processo de indexaçãoCitado por Google
    • Em processo de indexaçãoSimilares em Google

    Compartilhar


    Journal of the Southern African Institute of Mining and Metallurgy

    versão On-line ISSN 2411-9717versão impressa ISSN 2225-6253

    Resumo

    LABUSCHAGNE, J.P.; YILMAZ, H.  e  MPOLOKENG, L.. Critical investigation into the problems surrounding pillar holing operations. J. S. Afr. Inst. Min. Metall. [online]. 2015, vol.115, n.4, pp.307-312. ISSN 2411-9717.

    An investigation into pillar cutting was carried out at a platinum mine on the western limb of the Bushveld Complex. The focus was on crush pillar design and implementation in order to ultimately improve the compliance percentage for pillar cutting. The major findings from the investigation suggest that the pillar cutting problem lies with the implementation of the design rather than the design itself. Observations of the practical issues underground that prevent good pillar cutting were made. After these issues had been identified, recommendations to rectify these problems and a few other issues identified during the investigation were provided. The recommendations are aimed at improving the pillar cutting compliance and reducing the likelihood of pillar bursts or pillar runs, which will ultimately create a safer mining environment.

    Palavras-chave : crush pillar; design; practical issues; implementation.

            · texto em Inglês     · Inglês ( pdf )