SciELO - Scientific Electronic Library Online

 
vol.113 número10 índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Journal

Artigo

Indicadores

    Links relacionados

    • Em processo de indexaçãoCitado por Google
    • Em processo de indexaçãoSimilares em Google

    Compartilhar


    Journal of the Southern African Institute of Mining and Metallurgy

    versão On-line ISSN 2411-9717versão impressa ISSN 2225-6253

    Resumo

    CLAASSEN, J.O.. Yield improvement at a mid-sized coal mine in the Witbank coalfields. J. S. Afr. Inst. Min. Metall. [online]. 2013, vol.113, n.10, pp.761-768. ISSN 2411-9717.

    A study was initiated and solutions implemented to address the root causes of a 30°/o^J0°/o lower than predicted product yield achieved at a Mpumalanga coal mine. A holistic MRTM approach, which focused on improving exploration, geological sampling and analysis, geological modelling, planning, mining, and beneficiation practices, was used. The study indicated that deviations in the planned versus actual yields at the DMS plant were caused mainly by incorrect geological yield predictions, high and variable levels of dilution, and near-dense material, as well as the textural properties of the ore.

    Palavras-chave : MRTM; mining value chain improvement; Witbank coalfields; complex geology.

            · texto em Inglês     · Inglês ( pdf )