SciELO - Scientific Electronic Library Online

 
vol.26 número1Planning empty container relocations under uncertaintyTwo-commodity perishable inventory system with bulk demand for one commodity índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Journal

Artigo

Indicadores

    Links relacionados

    • Em processo de indexaçãoCitado por Google
    • Em processo de indexaçãoSimilares em Google

    Compartilhar


    South African Journal of Industrial Engineering

    versão On-line ISSN 2224-7890

    Resumo

    GROBBELAAR, S.  e  VISSER, J.K.. Determining the cost of predictive component replacement in order to assist with maintenance decision-making. S. Afr. J. Ind. Eng. [online]. 2015, vol.26, n.1, pp.150-162. ISSN 2224-7890.

    Asset and maintenance managers are often confronted with difficult decisions related to asset replacement or repair. Various analytical models, such as decision analysis and simulation, can assist a manager in making better decisions. This paper proposes that by combining renewal theory with decision analysis methods, the expected value (EV) of information for non-repairable components can be calculated. Subsequently, it is proposed that this method can be used to determine the expected replacement cost per unit time of predictive maintenance. It is argued that this predicted cost will give the maintenance decision-maker the ability to compare it to the cost of alternative maintenance strategies when choosing between strategies. Although this paper is limited to non-repairable components, the theory and methodology can also be applied to repairable systems.

            · resumo em Africaner     · texto em Inglês     · Inglês ( pdf )