SciELO - Scientific Electronic Library Online

 
vol.21 número1Development of a project management methodology for the consulting engineering industryThe discrete time, cost and quality trade-off problem in project scheduling: An efficient solution method based on CellDE algorithm índice de autoresíndice de assuntospesquisa de artigos
Home Pagelista alfabética de periódicos  

Serviços Personalizados

Journal

Artigo

Indicadores

    Links relacionados

    • Em processo de indexaçãoCitado por Google
    • Em processo de indexaçãoSimilares em Google

    Compartilhar


    South African Journal of Industrial Engineering

    versão On-line ISSN 2224-7890

    Resumo

    MUNAPO, E.. Project activity analysis without the network model. S. Afr. J. Ind. Eng. [online]. 2010, vol.21, n.1, pp.81-92. ISSN 2224-7890.

    This paper presents a new procedure for analysing and managing activity sequences in projects. The new procedure determines critical activities, critical path, start times, free floats, crash limits, and other useful information without the use of the network model. Even though network models have been successfully used in project management so far, there are weaknesses associated with the use. A network is not easy to generate, and dummies that are usually associated with it make the network diagram complex - and dummy activities have no meaning in the original project management problem. The network model for projects can be avoided while still obtaining all the useful information that is required for project management. What are required are the activities, their accurate durations, and their predecessors.

            · resumo em Africaner     · texto em Inglês     · Inglês ( pdf )