SciELO - Scientific Electronic Library Online

 
vol.23 número3 índice de autoresíndice de materiabúsqueda de artículos
Home Pagelista alfabética de revistas  

Servicios Personalizados

Revista

Articulo

Indicadores

    Links relacionados

    • En proceso de indezaciónCitado por Google
    • En proceso de indezaciónSimilares en Google

    Compartir


    South African Journal of Industrial Engineering

    versión On-line ISSN 2224-7890

    Resumen

    DE VILLIERS, A.P.; MATTHEWS, J.  y  VISAGIE, S.E.. Tour construction heuristics for an order sequencing problem. S. Afr. J. Ind. Eng. [online]. 2012, vol.23, n.3, pp.56-67. ISSN 2224-7890.

    An order picking system that requires pickers to move in a clockwise direction around a picking line with fixed locations is considered. The problem is divided into three tiers. The tier in which orders must be sequenced is addressed. Eight tour construction heuristics are developed and implemented for an order picking system operating in unidirectional picking lines. Two classes of tour construction heuristics - the tour construction starting position (TCS) and the tour construction ending position (TCE) - are developed to sequence orders in a picking line. All algorithms are tested and compared using real life data sets. The best solution quality was obtained by a TCE heuristic with adaptations.

            · resumen en Africano     · texto en Inglés     · Inglés ( pdf )