SciELO - Scientific Electronic Library Online

 
vol.113 issue10 author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Journal

Article

Indicators

    Related links

    • On index processCited by Google
    • On index processSimilars in Google

    Share


    Journal of the Southern African Institute of Mining and Metallurgy

    On-line version ISSN 2411-9717Print version ISSN 2225-6253

    Abstract

    CLAASSEN, J.O.. Yield improvement at a mid-sized coal mine in the Witbank coalfields. J. S. Afr. Inst. Min. Metall. [online]. 2013, vol.113, n.10, pp.761-768. ISSN 2411-9717.

    A study was initiated and solutions implemented to address the root causes of a 30°/o^J0°/o lower than predicted product yield achieved at a Mpumalanga coal mine. A holistic MRTM approach, which focused on improving exploration, geological sampling and analysis, geological modelling, planning, mining, and beneficiation practices, was used. The study indicated that deviations in the planned versus actual yields at the DMS plant were caused mainly by incorrect geological yield predictions, high and variable levels of dilution, and near-dense material, as well as the textural properties of the ore.

    Keywords : MRTM; mining value chain improvement; Witbank coalfields; complex geology.

            · text in English     · English ( pdf )