SciELO - Scientific Electronic Library Online

 
vol.25 issue1Quality performance: The case of construction projects in the electricity industry in KenyaHybrid supply chains in emerging markets: The case of the Mexican auto industry author indexsubject indexarticles search
Home Pagealphabetic serial listing  

Services on Demand

Journal

Article

Indicators

    Related links

    • On index processCited by Google
    • On index processSimilars in Google

    Share


    South African Journal of Industrial Engineering

    On-line version ISSN 2224-7890

    Abstract

    MARSUDI, M.  and  SHAFEEK, H.. Cycle time analysis of tipping trailer frame: A case study in a heavy equipment industry. S. Afr. J. Ind. Eng. [online]. 2014, vol.25, n.1, pp.176-188. ISSN 2224-7890.

    A key element with which manufacturing industries should concern themselves in respect of cost and efficiency of operation is the cycle time for preparing their products. A reduction in operational time can result in dramatic improvements in both cost and efficiency. Unfortunately, cycle time problems are sometimes difficult to analyse: there are many factors related to this parameter. This paper presents a cycle time analysis of a tipping trailer frame in a heavy equipment industry. The cycle time analysis, based on the cycle time data collected by a time study, together with the use of an Arena software simulation, is outlined. From the results of this study, it was found that the manufacturing cycle time was 56 hours, and that resources were under-utilised.

            · abstract in Afrikaans     · text in English     · English ( pdf )